Construction method for oversized artificial soil-piling landscaping mountain
The invention relates to a construction method of an oversized artificial soil-heaping landscaping mountain. The construction method comprises the following steps: before soil heaping, clearing a surface vegetation layer and cutting a slope from a scarp in an early stage; filling a primary peak and a secondary peak of the terrain subjected to surface cleaning in a grading and loading manner; after the main peak and the secondary peak are filled, geotextile and geogrids are laid on the surface of the mountain; arranging a horizontal sliding resistant pile and a cantilever retaining wall; after the soil is piled to the preset elevation and reaches the specified settlement rest period, scattered block stone piling is conducted on the mountain body; setting a mountain drainage pipe network; performing landscape greening on the mountain; and in the filling process and after completion, the mountain and surrounding buildings are monitored. According to the method, rigid row pile control, multiple measures for drainage and whole-process monitoring are combined, meanwhile, urban construction waste is used as part of mountain piling filler, mountain piling engineering can be completed, the urban construction waste can be consumed, the engineering cost is saved, and urban problems are solved.
本发明涉及一种超大体量人工堆土造景山体施工方法,包括:堆土前做好前期清除表层植被层和陡坎削本发明坡工作;清表完成后的地形,分级堆载填筑主、次峰;填筑主、次峰后在山体表面铺设土工布、土工格栅;设抗水平滑移桩和悬臂式挡土墙;在堆土至预定标高且达到规定沉降休止期后,在山体进行散置块石堆砌;山体排水管网设置;在山体进行景观绿化;在填筑过程及竣工后,对山体及周边建筑物进行监测。本发明采用刚性排桩控制、多种措施排水、全过程监测相结合,同时利用城市建筑垃圾做为部分堆山填料,不仅可以完成堆山工程,还可以消纳城市建筑垃圾,节约工程成本,解决城市难题。
Construction method for oversized artificial soil-piling landscaping mountain
The invention relates to a construction method of an oversized artificial soil-heaping landscaping mountain. The construction method comprises the following steps: before soil heaping, clearing a surface vegetation layer and cutting a slope from a scarp in an early stage; filling a primary peak and a secondary peak of the terrain subjected to surface cleaning in a grading and loading manner; after the main peak and the secondary peak are filled, geotextile and geogrids are laid on the surface of the mountain; arranging a horizontal sliding resistant pile and a cantilever retaining wall; after the soil is piled to the preset elevation and reaches the specified settlement rest period, scattered block stone piling is conducted on the mountain body; setting a mountain drainage pipe network; performing landscape greening on the mountain; and in the filling process and after completion, the mountain and surrounding buildings are monitored. According to the method, rigid row pile control, multiple measures for drainage and whole-process monitoring are combined, meanwhile, urban construction waste is used as part of mountain piling filler, mountain piling engineering can be completed, the urban construction waste can be consumed, the engineering cost is saved, and urban problems are solved.
本发明涉及一种超大体量人工堆土造景山体施工方法,包括:堆土前做好前期清除表层植被层和陡坎削本发明坡工作;清表完成后的地形,分级堆载填筑主、次峰;填筑主、次峰后在山体表面铺设土工布、土工格栅;设抗水平滑移桩和悬臂式挡土墙;在堆土至预定标高且达到规定沉降休止期后,在山体进行散置块石堆砌;山体排水管网设置;在山体进行景观绿化;在填筑过程及竣工后,对山体及周边建筑物进行监测。本发明采用刚性排桩控制、多种措施排水、全过程监测相结合,同时利用城市建筑垃圾做为部分堆山填料,不仅可以完成堆山工程,还可以消纳城市建筑垃圾,节约工程成本,解决城市难题。
Construction method for oversized artificial soil-piling landscaping mountain
超大体量人工堆土造景山体施工方法
CHEN WEIXING (author) / XIA BING (author) / SHEN JIAN (author) / ZHONG TONGQIANG (author) / WEI JUJING (author) / ZHOU KE (author) / HOU CHUANJIE (author)
2024-02-02
Patent
Electronic Resource
Chinese
European Patent Office | 2022
|A construction method of Artificial turf for landscaping
European Patent Office | 2016
|Collaborative utilization method of construction waste in piled mountain landscaping engineering
European Patent Office | 2020
|