A platform for research: civil engineering, architecture and urbanism
Iron tower hanging point lining clamping and fixing device
The invention provides an iron tower hanging point lining clamping and fixing device which comprises a plurality of fixing pieces, a plurality of clamping pieces and a plurality of clamping pieces, and one side of each fixing piece is connected with a communicating block; the multiple connecting assemblies are arranged on the surfaces of the multiple communicating blocks correspondingly; the multiple adjusting assemblies are arranged on the two sides of the multiple connecting assemblies, each adjusting assembly comprises a communicating base, and an adjusting rod is arranged in each communicating base; and the rotating assembly is arranged at the end part of the adjusting rod. According to the clamping and fixing device for the iron tower hanging point lining, the connecting assemblies are arranged on the surfaces of the multiple fixing pieces with the communicating blocks to be matched with operation between the adjusting rods with the communicating bases and the rotating assemblies, and the whole device can be adjusted to a proper position when an iron tower is installed in a layered mode; a plurality of fixing pieces can be connected to the iron tower at the same time and can be fixed at the same time, and therefore convenience and stability during operation can be improved.
本发明提供一种铁塔挂点衬套夹紧固定装置,包括:多个固定件,多个所述固定件的一侧均连接有连通块;多个连接组件,多个所述连接组件分别设置于多个所述连通块的表面;多个调节组件,多个所述调节组件均设置于多个所述连接组件的两侧,所述调节组件包括连通座,所述连通座的内部设置有调节杆;转动组件,所述转动组件设置于所述调节杆的端部。本发明提供的一种铁塔挂点衬套夹紧固定装置,在带有连通块的多个固定件的表面设置连接组件配合带有连通座的调节杆和转动组件之间操作,可以在进行铁塔分层安装时可以将整个装置调节至的合适的位置后,可以同时将多个固定件连接在铁塔上,能同时进行固定,从而能增加操作时的便捷性和稳定性。
Iron tower hanging point lining clamping and fixing device
The invention provides an iron tower hanging point lining clamping and fixing device which comprises a plurality of fixing pieces, a plurality of clamping pieces and a plurality of clamping pieces, and one side of each fixing piece is connected with a communicating block; the multiple connecting assemblies are arranged on the surfaces of the multiple communicating blocks correspondingly; the multiple adjusting assemblies are arranged on the two sides of the multiple connecting assemblies, each adjusting assembly comprises a communicating base, and an adjusting rod is arranged in each communicating base; and the rotating assembly is arranged at the end part of the adjusting rod. According to the clamping and fixing device for the iron tower hanging point lining, the connecting assemblies are arranged on the surfaces of the multiple fixing pieces with the communicating blocks to be matched with operation between the adjusting rods with the communicating bases and the rotating assemblies, and the whole device can be adjusted to a proper position when an iron tower is installed in a layered mode; a plurality of fixing pieces can be connected to the iron tower at the same time and can be fixed at the same time, and therefore convenience and stability during operation can be improved.
本发明提供一种铁塔挂点衬套夹紧固定装置,包括:多个固定件,多个所述固定件的一侧均连接有连通块;多个连接组件,多个所述连接组件分别设置于多个所述连通块的表面;多个调节组件,多个所述调节组件均设置于多个所述连接组件的两侧,所述调节组件包括连通座,所述连通座的内部设置有调节杆;转动组件,所述转动组件设置于所述调节杆的端部。本发明提供的一种铁塔挂点衬套夹紧固定装置,在带有连通块的多个固定件的表面设置连接组件配合带有连通座的调节杆和转动组件之间操作,可以在进行铁塔分层安装时可以将整个装置调节至的合适的位置后,可以同时将多个固定件连接在铁塔上,能同时进行固定,从而能增加操作时的便捷性和稳定性。
Iron tower hanging point lining clamping and fixing device
一种铁塔挂点衬套夹紧固定装置
WU SAI (author) / WANG YAJUN (author) / FAN ZHIYONG (author) / SHU YUMING (author) / XIE JIALIN (author) / CHENG XUAN (author)
2024-02-02
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES