A platform for research: civil engineering, architecture and urbanism
Combined arrangement waste incineration power plant and use method
The invention discloses a jointly-arranged waste incineration power plant and a using method, and belongs to the technical field of power plant arrangement. The power plant comprises a comprehensive plant, a steam engine room and a centralized control building. The comprehensive plant comprises a garbage unloading room, a garbage storage room, a boiler room and a flue gas purification room; the garbage discharging room is located at the end of the whole garbage incineration power plant, and the garbage storage room is arranged behind the garbage discharging room. A boiler room is arranged behind the garbage storage room; a flue gas purification room is arranged behind the boiler room; the steam engine room and the centralized control building are jointly arranged on the side face of the comprehensive plant. The steam engine room is arranged on one side of the boiler room; the centralized control building is arranged on one side of the garbage unloading room and the garbage storage room; and the steam engine room is arranged behind the centralized control building. According to the organic combination of process system functions and building design, the layout is compact, the space utilization rate is high, and the civil engineering quantity is greatly reduced.
本发明公开了一种联合布置的垃圾焚烧发电厂及使用方法,属于电厂布置技术领域。电厂包括综合厂房、汽机房及集控楼;所述综合厂房包括垃圾卸料间、垃圾储存间、锅炉间及烟气净化间;所述垃圾卸料间位于整个垃圾焚烧发电厂的端部,垃圾储存间设置在垃圾卸料间的后方;所述垃圾储存间的后方设置锅炉间;所述锅炉间的后方设置烟气净化间;所述汽机房及集控楼联合布置在综合厂房的侧面;所述汽机房设置在锅炉间的一侧;所述集控楼设置在垃圾卸料间及垃圾储存间的一侧;所述汽机房设置在集控楼的后方。本发明根据工艺系统功能与建筑设计有机结合,布局紧凑、空间利用率高,并且土建工程量大幅度减少。
Combined arrangement waste incineration power plant and use method
The invention discloses a jointly-arranged waste incineration power plant and a using method, and belongs to the technical field of power plant arrangement. The power plant comprises a comprehensive plant, a steam engine room and a centralized control building. The comprehensive plant comprises a garbage unloading room, a garbage storage room, a boiler room and a flue gas purification room; the garbage discharging room is located at the end of the whole garbage incineration power plant, and the garbage storage room is arranged behind the garbage discharging room. A boiler room is arranged behind the garbage storage room; a flue gas purification room is arranged behind the boiler room; the steam engine room and the centralized control building are jointly arranged on the side face of the comprehensive plant. The steam engine room is arranged on one side of the boiler room; the centralized control building is arranged on one side of the garbage unloading room and the garbage storage room; and the steam engine room is arranged behind the centralized control building. According to the organic combination of process system functions and building design, the layout is compact, the space utilization rate is high, and the civil engineering quantity is greatly reduced.
本发明公开了一种联合布置的垃圾焚烧发电厂及使用方法,属于电厂布置技术领域。电厂包括综合厂房、汽机房及集控楼;所述综合厂房包括垃圾卸料间、垃圾储存间、锅炉间及烟气净化间;所述垃圾卸料间位于整个垃圾焚烧发电厂的端部,垃圾储存间设置在垃圾卸料间的后方;所述垃圾储存间的后方设置锅炉间;所述锅炉间的后方设置烟气净化间;所述汽机房及集控楼联合布置在综合厂房的侧面;所述汽机房设置在锅炉间的一侧;所述集控楼设置在垃圾卸料间及垃圾储存间的一侧;所述汽机房设置在集控楼的后方。本发明根据工艺系统功能与建筑设计有机结合,布局紧凑、空间利用率高,并且土建工程量大幅度减少。
Combined arrangement waste incineration power plant and use method
一种联合布置的垃圾焚烧发电厂及使用方法
ZHANG LINLIN (author) / KANG YUE (author) / LIU FEIPENG (author) / LYU SHAOFENG (author) / LI NA (author) / YANG FANG (author)
2024-02-06
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Waste incineration power plant waste pool cleaning system and construction method
European Patent Office | 2024
|European Patent Office | 2024
|INCINERATION AND ENERGY FROM WASTE - Power generation from waste incineration
Online Contents | 2001
|Leachate collecting device suitable for waste incineration power plant
European Patent Office | 2024
|