A platform for research: civil engineering, architecture and urbanism
Erecting and pushing device for steel box girder
The invention discloses an erecting and pushing device for a steel box girder, and belongs to the technical field of bridge construction, the erecting and pushing device comprises a frame body, a first connecting plate is fixedly connected to the top surface of the frame body, supporting mechanisms are fixedly connected to the two sides of the top surface of the first connecting plate respectively, a pushing mechanism is fixedly connected to the top surface of the first connecting plate, and the pushing mechanism is located between the two supporting mechanisms; the pushing mechanism comprises a second connecting plate fixedly connected with the top face of the first connecting plate, a pushing part is slidably connected into the second connecting plate, a supporting part is arranged on the top face of the pushing part, and a measuring mechanism is arranged on one side of the top face of the second connecting plate. A to-be-moved beam body is lifted through the supporting part, the beam body is moved through the pushing part after being lifted, the measuring mechanism is used for measuring the position of the beam body in the moving process, and the situation that the position of the beam body deviates in the moving process, and consequently danger is caused is prevented. The stability of the steel box girder is improved, and the construction difficulty and the construction danger are reduced.
本发明公开一种钢箱梁的架设顶推装置,属于桥梁施工技术领域,包括架体,架体的顶面固接有第一连接板,第一连接板的顶面两侧分别固接有支撑机构,第一连接板的顶面固接有顶推机构,顶推机构位于两个支撑机构之间,顶推机构包括与第一连接板顶面固接的第二连接板,第二连接板内滑动连接有推动部,推动部的顶面设有支撑部,第二连接板的顶面一侧设有测量机构。通过支撑部将待移动的梁体抬起,抬起后通过推动部使梁体移动,测量机构用于测量梁体在移动过程中的位置,防止梁体在移动过程中位置发生偏移,导致发生危险。本发明提高了钢箱梁的稳定性,降低了施工难度及施工危险性。
Erecting and pushing device for steel box girder
The invention discloses an erecting and pushing device for a steel box girder, and belongs to the technical field of bridge construction, the erecting and pushing device comprises a frame body, a first connecting plate is fixedly connected to the top surface of the frame body, supporting mechanisms are fixedly connected to the two sides of the top surface of the first connecting plate respectively, a pushing mechanism is fixedly connected to the top surface of the first connecting plate, and the pushing mechanism is located between the two supporting mechanisms; the pushing mechanism comprises a second connecting plate fixedly connected with the top face of the first connecting plate, a pushing part is slidably connected into the second connecting plate, a supporting part is arranged on the top face of the pushing part, and a measuring mechanism is arranged on one side of the top face of the second connecting plate. A to-be-moved beam body is lifted through the supporting part, the beam body is moved through the pushing part after being lifted, the measuring mechanism is used for measuring the position of the beam body in the moving process, and the situation that the position of the beam body deviates in the moving process, and consequently danger is caused is prevented. The stability of the steel box girder is improved, and the construction difficulty and the construction danger are reduced.
本发明公开一种钢箱梁的架设顶推装置,属于桥梁施工技术领域,包括架体,架体的顶面固接有第一连接板,第一连接板的顶面两侧分别固接有支撑机构,第一连接板的顶面固接有顶推机构,顶推机构位于两个支撑机构之间,顶推机构包括与第一连接板顶面固接的第二连接板,第二连接板内滑动连接有推动部,推动部的顶面设有支撑部,第二连接板的顶面一侧设有测量机构。通过支撑部将待移动的梁体抬起,抬起后通过推动部使梁体移动,测量机构用于测量梁体在移动过程中的位置,防止梁体在移动过程中位置发生偏移,导致发生危险。本发明提高了钢箱梁的稳定性,降低了施工难度及施工危险性。
Erecting and pushing device for steel box girder
钢箱梁的架设顶推装置
DAI CHUANGUANG (author) / PAN CHAO (author) / MEN XUE (author) / ZHANG JIA (author) / WANG CHAO (author) / YUAN FENG (author) / ZHANG PENG (author) / YU LONG (author)
2024-02-09
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Steel box girder pushing system and steel box girder pushing construction method
European Patent Office | 2024
|