A platform for research: civil engineering, architecture and urbanism
The invention discloses a highway subgrade construction process and filling equipment, and aims to solve the problem that the working intensity is relatively high when stone gaps are manually filled. According to the technical scheme, the material flattening device is characterized by comprising a rack, a material cavity and a material guiding cavity communicated with the material cavity, the rack is rotationally connected with a roller, the material guiding cavity is located in front of the roller, an opening, away from the material cavity, of the material guiding cavity faces the ground, and a flattening assembly is arranged in the material guiding cavity and connected with a driving assembly. The filling equipment is designed to replace workers for direct filling, the effect of reducing the working intensity of the workers is achieved, the leveling assembly is used for leveling the guided-out rock ballast and medium-coarse sand, the rock ballast and the medium-coarse sand can better enter gaps, and the filling effect is guaranteed.
本发明公开一种公路路基施工工艺及填补设备,旨在解决人工进行石块空隙填补工作强度较高的问题。其技术方案要点是:包括机架、物料腔以及与物料腔相连通的导料腔,所述机架转动连接有滚轮,所述导料腔位于滚轮的前方,所述导料腔远离物料腔的开口面向地面,所述导料腔内部设置有平整组件,所述平整组件连接有驱动组件。本发明通过设计填补设备来替代工人直接填补,起到降低工作人员工作强度的效果,其中利用平整组件实现对导出的石渣和中粗砂整平,使得石渣和中粗砂可以更好的进入空隙中,保证填补效果。
The invention discloses a highway subgrade construction process and filling equipment, and aims to solve the problem that the working intensity is relatively high when stone gaps are manually filled. According to the technical scheme, the material flattening device is characterized by comprising a rack, a material cavity and a material guiding cavity communicated with the material cavity, the rack is rotationally connected with a roller, the material guiding cavity is located in front of the roller, an opening, away from the material cavity, of the material guiding cavity faces the ground, and a flattening assembly is arranged in the material guiding cavity and connected with a driving assembly. The filling equipment is designed to replace workers for direct filling, the effect of reducing the working intensity of the workers is achieved, the leveling assembly is used for leveling the guided-out rock ballast and medium-coarse sand, the rock ballast and the medium-coarse sand can better enter gaps, and the filling effect is guaranteed.
本发明公开一种公路路基施工工艺及填补设备,旨在解决人工进行石块空隙填补工作强度较高的问题。其技术方案要点是:包括机架、物料腔以及与物料腔相连通的导料腔,所述机架转动连接有滚轮,所述导料腔位于滚轮的前方,所述导料腔远离物料腔的开口面向地面,所述导料腔内部设置有平整组件,所述平整组件连接有驱动组件。本发明通过设计填补设备来替代工人直接填补,起到降低工作人员工作强度的效果,其中利用平整组件实现对导出的石渣和中粗砂整平,使得石渣和中粗砂可以更好的进入空隙中,保证填补效果。
Highway subgrade construction process and filling equipment
一种公路路基施工工艺及填补设备
2024-02-13
Patent
Electronic Resource
Chinese
Highway subgrade reinforcing construction equipment and construction method
European Patent Office | 2023
|Mountainside highway subgrade broadening structure and construction process
European Patent Office | 2020
|