The invention discloses an installation process of a modular elevator shaft. The modular elevator shaft comprises a framework, installation wings, a connecting mechanism and a glass wall. The mounting process of the modular elevator shaft comprises the following steps that S1, four beam bodies are mounted at the ends of four beam column sections before leaving a factory; s2, the lower frame section is installed at the elevator shaft installation position on site; s3, a crane is used for hanging the upper frame section on site, an operator assists in aligning a guide plate in the upper frame section with a beam column section in the lower frame section, and the guide plate in the upper frame section is inserted into the beam column section in the lower frame section under the assistance of the crane; s4, welding the middle beam column section of the upper frame section and the middle beam column section of the lower frame section; and S5, hanging the glass wall beside the frame section by using a crane on site, and mounting the glass wall on the mounting wing through the connecting mechanism. The installation process of the modularized elevator shaft solves the problem that in the prior art, a framework is needed to support a glass wall, and consequently a cross beam in the framework is exposed.
本发明公开了一种模块化电梯井道的安装工艺,所述模块化电梯井道包括:骨架、安装翼、连接机构以及玻璃墙壁;所述一种模块化电梯井道的安装工艺包括如下步骤:S1、出厂之前在四根梁柱节的端部安装上四根梁体;S2、现场将下方架节安装在电梯井安装位置;S3、现场使用吊机悬吊上方架节,操作人员辅助将上方架节中导向板与下方架节中梁柱节对准,在吊机的辅助下将上方架节中导向板插入到下方架节中梁柱节中;S4、焊接将上方架节中梁柱节与下方架节中梁柱节焊接;S5、现场使用吊机将玻璃墙壁悬吊在架节旁,且通过连接机构将玻璃墙壁安装在安装翼上。该模块化电梯井道的安装工艺解决现有技术中因需要骨架支撑玻璃墙壁而导致骨架中横梁外漏的问题。
The invention discloses an installation process of a modular elevator shaft. The modular elevator shaft comprises a framework, installation wings, a connecting mechanism and a glass wall. The mounting process of the modular elevator shaft comprises the following steps that S1, four beam bodies are mounted at the ends of four beam column sections before leaving a factory; s2, the lower frame section is installed at the elevator shaft installation position on site; s3, a crane is used for hanging the upper frame section on site, an operator assists in aligning a guide plate in the upper frame section with a beam column section in the lower frame section, and the guide plate in the upper frame section is inserted into the beam column section in the lower frame section under the assistance of the crane; s4, welding the middle beam column section of the upper frame section and the middle beam column section of the lower frame section; and S5, hanging the glass wall beside the frame section by using a crane on site, and mounting the glass wall on the mounting wing through the connecting mechanism. The installation process of the modularized elevator shaft solves the problem that in the prior art, a framework is needed to support a glass wall, and consequently a cross beam in the framework is exposed.
本发明公开了一种模块化电梯井道的安装工艺,所述模块化电梯井道包括:骨架、安装翼、连接机构以及玻璃墙壁;所述一种模块化电梯井道的安装工艺包括如下步骤:S1、出厂之前在四根梁柱节的端部安装上四根梁体;S2、现场将下方架节安装在电梯井安装位置;S3、现场使用吊机悬吊上方架节,操作人员辅助将上方架节中导向板与下方架节中梁柱节对准,在吊机的辅助下将上方架节中导向板插入到下方架节中梁柱节中;S4、焊接将上方架节中梁柱节与下方架节中梁柱节焊接;S5、现场使用吊机将玻璃墙壁悬吊在架节旁,且通过连接机构将玻璃墙壁安装在安装翼上。该模块化电梯井道的安装工艺解决现有技术中因需要骨架支撑玻璃墙壁而导致骨架中横梁外漏的问题。
Modularized elevator shaft mounting process
一种模块化电梯井道的安装工艺
MAO XIANJIN (author)
2024-02-13
Patent
Electronic Resource
Chinese
Prefabricated laminated elevator shaft and mounting method thereof
European Patent Office | 2020
|Mounting structure and mounting method of elevator shaft frame suspended ceiling
European Patent Office | 2023
|