A platform for research: civil engineering, architecture and urbanism
Operation method of rail changing operation vehicle
The embodiment of the invention provides an operation method of a rail changing operation vehicle. The operation method comprises the following steps that S10, two new rails are placed on the outer sides of two old rails in a to-be-changed rail operation area correspondingly; s20, taking one end or two ends of the to-be-changed rail operation area as a non-changed rail operation area, and placing the rail changing operation vehicle between the to-be-changed rail operation area and the non-changed rail operation area; s30, rail replacement is conducted, specifically, the starting end of the old rail is pulled out, then the rail replacement operation vehicle moves towards the operation area where the rail is to be replaced to conduct rail replacement operation, and the old rail in the operation area where the rail is to be replaced is replaced with a new rail; s40, rail pulling and locking; s650, the old rail is collected; the device has the advantages of being easy to operate, high in working efficiency and capable of guaranteeing the quality. The method is suitable for the technical field of railway track maintenance.
本申请实施例提供一种换轨作业车的作业方法,包括以下步骤:S10,将两条新轨分别放置于待换轨作业区中两条旧轨的外侧;S20,以待换轨作业区的一端或两端为非换轨作业区,将换轨作业车放置于待换轨作业区与非换轨作业区之间;S30,换轨:将旧轨的起始端部向外拨出,然后换轨作业车向待换轨作业区行进进行换轨作业,将待换轨作业区的旧轨更换为新轨;S40,拉轨锁定;S650,收旧轨;具有操作简单、工作效率高、质量能够得到保障的有益效果;适用于铁路轨道维修养护的技术领域。
Operation method of rail changing operation vehicle
The embodiment of the invention provides an operation method of a rail changing operation vehicle. The operation method comprises the following steps that S10, two new rails are placed on the outer sides of two old rails in a to-be-changed rail operation area correspondingly; s20, taking one end or two ends of the to-be-changed rail operation area as a non-changed rail operation area, and placing the rail changing operation vehicle between the to-be-changed rail operation area and the non-changed rail operation area; s30, rail replacement is conducted, specifically, the starting end of the old rail is pulled out, then the rail replacement operation vehicle moves towards the operation area where the rail is to be replaced to conduct rail replacement operation, and the old rail in the operation area where the rail is to be replaced is replaced with a new rail; s40, rail pulling and locking; s650, the old rail is collected; the device has the advantages of being easy to operate, high in working efficiency and capable of guaranteeing the quality. The method is suitable for the technical field of railway track maintenance.
本申请实施例提供一种换轨作业车的作业方法,包括以下步骤:S10,将两条新轨分别放置于待换轨作业区中两条旧轨的外侧;S20,以待换轨作业区的一端或两端为非换轨作业区,将换轨作业车放置于待换轨作业区与非换轨作业区之间;S30,换轨:将旧轨的起始端部向外拨出,然后换轨作业车向待换轨作业区行进进行换轨作业,将待换轨作业区的旧轨更换为新轨;S40,拉轨锁定;S650,收旧轨;具有操作简单、工作效率高、质量能够得到保障的有益效果;适用于铁路轨道维修养护的技术领域。
Operation method of rail changing operation vehicle
一种换轨作业车的作业方法
TAO XIAOHU (author) / ZHANG ZHONGJIAN (author) / TANG MINGMING (author) / HUANG QIONGYA (author) / YUAN SHUAI (author) / MAO JIANGNAN (author) / ZHANG ZHIJIAN (author)
2024-02-20
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Rail changing operation vehicle and rail changing system
European Patent Office | 2024
|Welding changing and welding operation vehicle set and rail changing method
European Patent Office | 2021
|Railway multifunctional integrated rail changing operation vehicle set
European Patent Office | 2023
|Continuous rail changing operation train and operation method thereof
European Patent Office | 2015
|