Pine pile and pebble supporting construction method for ecological bank protection
The invention discloses a pine pile and pebble supporting construction method for an ecological bank protection. The pine pile and pebble supporting construction method comprises the following steps that S1, pine piles are machined; s2, processing a positioning pipe; s3, the construction site is excavated on the ecological revetment; s4, positioning pipes are placed on the foundation one by one; s5, pine piles are driven into pipe holes of the steel pipes; s6, the top of the pine pile is pressed by the base plate, and then the pine pile is bundled by the iron wire; s7, the space between the steel pipe and the pine pile is filled with mortar; s8, the supporting rod and the supporting plate which are fixedly connected are dismantled; s9, the foundation is backfilled with soil; and S10, the pebbles are stacked on the plain concrete base layer in a staggered mode. It can be guaranteed that the pine piles vertically enter the foundation, the depth of the pine piles reaches a bearing stratum, and obvious horizontal deviation does not occur. And the whole row of pine piles are connected into an integral structure, so that the supporting strength of the pine piles is improved, and the condition of settlement in later pebble laying is reduced.
本发明公开了生态护岸松木桩卵石支护施工方法,包括如下步骤:S1、对松木桩加工处理;S2、定位管加工;S3、在生态护岸上对施工现场开挖;S4、在地基上逐个放置定位管;S5、在钢管的管孔中打入松木桩;S6、底盘压紧松木桩的顶部,接着将铁丝捆住松木桩;S7、在钢管和松木桩之间的空间中填入砂浆;S8、拆除固定连接的支撑杆和支撑板;S9、在地基上回填土壤;S10、将卵石错落层叠在素砼基础层上。本发明能保证松木桩垂直进入地基中,使松木桩深度达到持力层,未见明显水平方向的偏移。而且整排松木桩连接成整体结构,提高了松木桩支护强度,减少后期卵石铺设出现沉降的情况。
Pine pile and pebble supporting construction method for ecological bank protection
The invention discloses a pine pile and pebble supporting construction method for an ecological bank protection. The pine pile and pebble supporting construction method comprises the following steps that S1, pine piles are machined; s2, processing a positioning pipe; s3, the construction site is excavated on the ecological revetment; s4, positioning pipes are placed on the foundation one by one; s5, pine piles are driven into pipe holes of the steel pipes; s6, the top of the pine pile is pressed by the base plate, and then the pine pile is bundled by the iron wire; s7, the space between the steel pipe and the pine pile is filled with mortar; s8, the supporting rod and the supporting plate which are fixedly connected are dismantled; s9, the foundation is backfilled with soil; and S10, the pebbles are stacked on the plain concrete base layer in a staggered mode. It can be guaranteed that the pine piles vertically enter the foundation, the depth of the pine piles reaches a bearing stratum, and obvious horizontal deviation does not occur. And the whole row of pine piles are connected into an integral structure, so that the supporting strength of the pine piles is improved, and the condition of settlement in later pebble laying is reduced.
本发明公开了生态护岸松木桩卵石支护施工方法,包括如下步骤:S1、对松木桩加工处理;S2、定位管加工;S3、在生态护岸上对施工现场开挖;S4、在地基上逐个放置定位管;S5、在钢管的管孔中打入松木桩;S6、底盘压紧松木桩的顶部,接着将铁丝捆住松木桩;S7、在钢管和松木桩之间的空间中填入砂浆;S8、拆除固定连接的支撑杆和支撑板;S9、在地基上回填土壤;S10、将卵石错落层叠在素砼基础层上。本发明能保证松木桩垂直进入地基中,使松木桩深度达到持力层,未见明显水平方向的偏移。而且整排松木桩连接成整体结构,提高了松木桩支护强度,减少后期卵石铺设出现沉降的情况。
Pine pile and pebble supporting construction method for ecological bank protection
生态护岸松木桩卵石支护施工方法
WANG HAIYANG (author) / YU XUNXUN (author) / WANG MENGMENG (author) / ZHANG YUN (author) / LIU YAN (author) / CHEN JIAN (author)
2024-02-20
Patent
Electronic Resource
Chinese
Pine pile supporting device with automatic positioning system and pine pile supporting method
European Patent Office | 2022
|European Patent Office | 2023
|Pore-forming wall protection method for pebble bed pile foundation
European Patent Office | 2023
|Pile foundation type slope ecological bank protection engineering structure
European Patent Office | 2024
|