Formwork-free construction method for constructional column
The invention is applicable to the technical field of constructional column construction, and provides a constructional column formwork-free construction method which comprises the following steps: step 1, checking and accepting a base layer and paying off a wall body; secondly, cement mortar is mixed, by arranging the prefabricated mold and four adjusting plates arranged in the prefabricated mold, when the prefabricated cement bricks are prepared, the prefabricated cement bricks of the corresponding size can be prepared according to a design drawing, and compared with a traditional prefabricated mold manufactured through a mold plate, the prefabricated cement bricks of the corresponding size can be manufactured; according to the mold body, preparation of prefabricated cement bricks of various sizes can be achieved, adaptability is wider, recycling is facilitated, the mold body can be just installed in a staggered-layer-shaped gap reserved between walls on the two sides through the U-shaped plate, then a constructional column reinforcement cage is wrapped, the mold body is directly built on the walls, and formwork erecting and pouring do not need to be conducted on constructional columns.
本发明适用于构造柱施工技术领域,提供了一种构造柱免支模施工方法,包括以下步骤:步骤一、基层验收与墙体放线;步骤二、拌制水泥砂浆,通过设置预制模具,以及设置在预制模具内的四调节板,可在进行预制水泥砖的制备时,根据设计图纸制备对应尺寸的预制水泥砖,相对于传统的采用模板制作的预制模具,该模具本体可实现多种尺寸预制水泥砖的制备,适应性更广,且利于重复利用,通过设置有U型板,能够正好安装在两侧墙体之间所预留的错层状间隙处,进而形成对构造柱钢筋笼的包裹,且直接砌筑在墙体上,无需对构造柱进行支模浇筑。
Formwork-free construction method for constructional column
The invention is applicable to the technical field of constructional column construction, and provides a constructional column formwork-free construction method which comprises the following steps: step 1, checking and accepting a base layer and paying off a wall body; secondly, cement mortar is mixed, by arranging the prefabricated mold and four adjusting plates arranged in the prefabricated mold, when the prefabricated cement bricks are prepared, the prefabricated cement bricks of the corresponding size can be prepared according to a design drawing, and compared with a traditional prefabricated mold manufactured through a mold plate, the prefabricated cement bricks of the corresponding size can be manufactured; according to the mold body, preparation of prefabricated cement bricks of various sizes can be achieved, adaptability is wider, recycling is facilitated, the mold body can be just installed in a staggered-layer-shaped gap reserved between walls on the two sides through the U-shaped plate, then a constructional column reinforcement cage is wrapped, the mold body is directly built on the walls, and formwork erecting and pouring do not need to be conducted on constructional columns.
本发明适用于构造柱施工技术领域,提供了一种构造柱免支模施工方法,包括以下步骤:步骤一、基层验收与墙体放线;步骤二、拌制水泥砂浆,通过设置预制模具,以及设置在预制模具内的四调节板,可在进行预制水泥砖的制备时,根据设计图纸制备对应尺寸的预制水泥砖,相对于传统的采用模板制作的预制模具,该模具本体可实现多种尺寸预制水泥砖的制备,适应性更广,且利于重复利用,通过设置有U型板,能够正好安装在两侧墙体之间所预留的错层状间隙处,进而形成对构造柱钢筋笼的包裹,且直接砌筑在墙体上,无需对构造柱进行支模浇筑。
Formwork-free construction method for constructional column
一种构造柱免支模施工方法
GAO QINGLONG (author) / WU JING (author) / ZHENG LIU (author) / LIN XING (author) / LEI HONGLONG (author)
2024-02-20
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Formwork-free constructional column and construction method
European Patent Office | 2015
|Formwork-free prefabricated assembled constructional column formwork
European Patent Office | 2023
|European Patent Office | 2022
|Prefabricated constructional column structure for formwork-free construction
European Patent Office | 2023
|