A platform for research: civil engineering, architecture and urbanism
Construction method for continuously laying soil covering type impermeable membrane
According to the continuous laying construction method for the soil covering type anti-seepage film, when the construction method is used for laying the soil covering type anti-seepage film, continuous construction of earth excavation, anti-seepage film laying, anti-seepage film welding and soil covering on the film in a single-roll anti-seepage film covering area can be achieved, the earth does not need to be additionally conveyed to a site, the economical efficiency is good, and the construction efficiency is high; according to the method, due to continuous laying, after the impermeable membrane of each construction unit is welded, soil can be covered in time, the exposure time of the impermeable membrane in the air is shortened, earthwork transportation machinery is not needed, finished product protection can be effectively implemented, the laying quality of the impermeable membrane can be effectively guaranteed, additional construction materials do not need to be customized, and the construction cost is reduced. And the method can be realized only by using conventional construction machinery, so that the generalizability is better.
本发明提供一种覆土式防渗膜连续铺设施工方法,使用该施工方法铺设覆土式防渗膜时,可实现单卷防渗膜覆膜区域土方开挖‑防渗膜铺设‑防渗膜焊接‑膜上覆土连续施工,无需额外运送土方进场,经济性好,施工效率高;该方法由于其连续铺设,每一个施工单元防渗膜焊接完成后,可以及时覆土,减少其在空气中暴露的时间,无需土方运输机械,能够有效实施成品保护,防渗膜铺设质量能够得到有效保证,本方法无需定制额外施工材料,仅使用常规施工机械即可实现,可推广性较好。
Construction method for continuously laying soil covering type impermeable membrane
According to the continuous laying construction method for the soil covering type anti-seepage film, when the construction method is used for laying the soil covering type anti-seepage film, continuous construction of earth excavation, anti-seepage film laying, anti-seepage film welding and soil covering on the film in a single-roll anti-seepage film covering area can be achieved, the earth does not need to be additionally conveyed to a site, the economical efficiency is good, and the construction efficiency is high; according to the method, due to continuous laying, after the impermeable membrane of each construction unit is welded, soil can be covered in time, the exposure time of the impermeable membrane in the air is shortened, earthwork transportation machinery is not needed, finished product protection can be effectively implemented, the laying quality of the impermeable membrane can be effectively guaranteed, additional construction materials do not need to be customized, and the construction cost is reduced. And the method can be realized only by using conventional construction machinery, so that the generalizability is better.
本发明提供一种覆土式防渗膜连续铺设施工方法,使用该施工方法铺设覆土式防渗膜时,可实现单卷防渗膜覆膜区域土方开挖‑防渗膜铺设‑防渗膜焊接‑膜上覆土连续施工,无需额外运送土方进场,经济性好,施工效率高;该方法由于其连续铺设,每一个施工单元防渗膜焊接完成后,可以及时覆土,减少其在空气中暴露的时间,无需土方运输机械,能够有效实施成品保护,防渗膜铺设质量能够得到有效保证,本方法无需定制额外施工材料,仅使用常规施工机械即可实现,可推广性较好。
Construction method for continuously laying soil covering type impermeable membrane
覆土式防渗膜连续铺设施工方法
JIAO JINLEI (author) / XU JUNHUA (author) / LI BIN (author) / FANG SHIXIONG (author) / PENG CHENG (author) / SHI LEI (author) / YI YU (author) / YU SHOUFENG (author) / YAN JIAMIN (author)
2024-02-23
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Impermeable covering for stone arches
Engineering Index Backfile | 1896
Connecting and sealing system for vertical laying of impermeable membrane
European Patent Office | 2022
|Tool and method for laying granular impermeable materials
European Patent Office | 2015
|