The impermeable membrane construction method comprises the following operation steps that S1, selecting an impermeable membrane meeting construction conditions, the impermeable membrane is a polyethylene geomembrane, storing and transporting the impermeable membrane in a winding mode, the length of each roll of impermeable membrane is 90-105 m, wherein the width of each roll of impermeable membrane is 8-10 m; S2, winding the selected anti-seepage membrane, conveying the wound anti-seepage membrane to an appointed position through a crane, binding the crane and the geomembrane through a special membrane hanging belt, and protecting the anti-seepage membrane, and S3, preparing a peelable protective outer membrane which comprises a peelable outer membrane and a peelable adhesive material. According to the impermeable membrane construction method, the peelable protective outer membrane is arranged on the outer surface, the outer surface of the impermeable membrane is protected during construction laying, the abrasion condition is not prone to occurring, a foundation is subjected to reinforcement operation, the surface is ground flat, the construction effect is improved, the impermeable membrane construction method is more stable, and better use prospects are brought.
本发明公开了一种防渗膜施工方法,包括以下操作步骤:S1:挑选符合施工条件的防渗膜,所述防渗膜为聚乙烯土工膜,所述防渗膜以绕卷的方式进行存储与运输,每卷防渗膜的长度为90~105m,宽度为8~10m;S2:然后将选取的防渗膜卷绕后通过吊机输送到指定的位置,吊机与土工膜之前采用专用的吊膜带进行捆绑,对防渗膜进行保护,S3:制备可剥离防护外膜,所述可剥离防护外膜包括可剥离外膜、可剥离粘胶材料。本发明所述的一种防渗膜施工方法,外表面设置有可剥离防护外膜,在进行施工铺设的时候对防渗膜的外表面进行保护,不易出现磨损的情况,对地基进行加固操作,表面磨平,增加施工效果,更加稳定,带来更好的使用前景。
The impermeable membrane construction method comprises the following operation steps that S1, selecting an impermeable membrane meeting construction conditions, the impermeable membrane is a polyethylene geomembrane, storing and transporting the impermeable membrane in a winding mode, the length of each roll of impermeable membrane is 90-105 m, wherein the width of each roll of impermeable membrane is 8-10 m; S2, winding the selected anti-seepage membrane, conveying the wound anti-seepage membrane to an appointed position through a crane, binding the crane and the geomembrane through a special membrane hanging belt, and protecting the anti-seepage membrane, and S3, preparing a peelable protective outer membrane which comprises a peelable outer membrane and a peelable adhesive material. According to the impermeable membrane construction method, the peelable protective outer membrane is arranged on the outer surface, the outer surface of the impermeable membrane is protected during construction laying, the abrasion condition is not prone to occurring, a foundation is subjected to reinforcement operation, the surface is ground flat, the construction effect is improved, the impermeable membrane construction method is more stable, and better use prospects are brought.
本发明公开了一种防渗膜施工方法,包括以下操作步骤:S1:挑选符合施工条件的防渗膜,所述防渗膜为聚乙烯土工膜,所述防渗膜以绕卷的方式进行存储与运输,每卷防渗膜的长度为90~105m,宽度为8~10m;S2:然后将选取的防渗膜卷绕后通过吊机输送到指定的位置,吊机与土工膜之前采用专用的吊膜带进行捆绑,对防渗膜进行保护,S3:制备可剥离防护外膜,所述可剥离防护外膜包括可剥离外膜、可剥离粘胶材料。本发明所述的一种防渗膜施工方法,外表面设置有可剥离防护外膜,在进行施工铺设的时候对防渗膜的外表面进行保护,不易出现磨损的情况,对地基进行加固操作,表面磨平,增加施工效果,更加稳定,带来更好的使用前景。
CONSTRUCTION METHOD FOR UNDERGROUND IMPERMEABLE WALL, AND UNDERGROUND IMPERMEABLE WALL
European Patent Office | 2016
|Construction method for continuously laying soil covering type impermeable membrane
European Patent Office | 2024
|Novel impermeable membrane transverse insertion device and construction method thereof
European Patent Office | 2024
|Water conservancy project impermeable membrane cofferdam structure and construction method thereof
European Patent Office | 2021
|Precipitation construction method of impermeable interlayer
European Patent Office | 2022
|