Construction method and device for reinforced concrete wrapped steel pipe concrete column
The invention relates to a construction method and device for a reinforced concrete encased steel pipe concrete column. The construction method comprises the following construction steps: step 1, construction preparation; secondly, the multiple steel pipe columns are hoisted at the same time; thirdly, the steel pipe column is hoisted, positioned and installed; 4, steel pipe column reinforcing construction is conducted; 5, steel bar binding construction is carried out; sixthly, formwork construction is conducted; seventhly, concrete pouring construction is conducted; 8, the formwork is removed; after concrete curing is completed, the formwork is dismantled; and ninthly, construction is completed, inspection and acceptance are conducted, and equipment and machines are dismantled and returned. The invention belongs to the field of house building engineering construction, and not only can improve the stability and convenience of a cylindrical formwork, the construction efficiency and safety of steel pipe horizontal-to-vertical hoisting, the steel bar binding accuracy and the concrete pouring and vibrating construction efficiency, but also ensures the concrete vibrating construction quality, greatly improves the field construction efficiency, saves manpower and cost, and improves the construction efficiency. And good technical and economic benefits can be obtained when the method is applied to practical engineering.
本发明涉及钢筋混凝土外包钢管混凝土柱施工方法及装置,施工步骤包括:步骤一,施工准备;步骤二,多钢管柱同时吊装;步骤三,钢管柱的吊运定位安装;步骤四,钢管柱加固施工;步骤五,钢筋绑扎施工;步骤六,模板施工;步骤七,混凝土浇筑施工;步骤八,模板拆除;混凝土养护完成后进行模板拆除;步骤九,施工完毕并检查验收,设备和机械拆除退场。本发明属于房屋建筑工程施工领域,不但可以提高圆柱模板的稳定性和便捷性、钢管平转竖吊起施工效率和安全性、钢筋绑扎精确性、混凝土浇筑和振捣施工效率,同时保证了混凝土振捣施工质量,大大提高现场施工效率,节省人力和成本,应用于实际工程中可取得较好的技术经济效益。
Construction method and device for reinforced concrete wrapped steel pipe concrete column
The invention relates to a construction method and device for a reinforced concrete encased steel pipe concrete column. The construction method comprises the following construction steps: step 1, construction preparation; secondly, the multiple steel pipe columns are hoisted at the same time; thirdly, the steel pipe column is hoisted, positioned and installed; 4, steel pipe column reinforcing construction is conducted; 5, steel bar binding construction is carried out; sixthly, formwork construction is conducted; seventhly, concrete pouring construction is conducted; 8, the formwork is removed; after concrete curing is completed, the formwork is dismantled; and ninthly, construction is completed, inspection and acceptance are conducted, and equipment and machines are dismantled and returned. The invention belongs to the field of house building engineering construction, and not only can improve the stability and convenience of a cylindrical formwork, the construction efficiency and safety of steel pipe horizontal-to-vertical hoisting, the steel bar binding accuracy and the concrete pouring and vibrating construction efficiency, but also ensures the concrete vibrating construction quality, greatly improves the field construction efficiency, saves manpower and cost, and improves the construction efficiency. And good technical and economic benefits can be obtained when the method is applied to practical engineering.
本发明涉及钢筋混凝土外包钢管混凝土柱施工方法及装置,施工步骤包括:步骤一,施工准备;步骤二,多钢管柱同时吊装;步骤三,钢管柱的吊运定位安装;步骤四,钢管柱加固施工;步骤五,钢筋绑扎施工;步骤六,模板施工;步骤七,混凝土浇筑施工;步骤八,模板拆除;混凝土养护完成后进行模板拆除;步骤九,施工完毕并检查验收,设备和机械拆除退场。本发明属于房屋建筑工程施工领域,不但可以提高圆柱模板的稳定性和便捷性、钢管平转竖吊起施工效率和安全性、钢筋绑扎精确性、混凝土浇筑和振捣施工效率,同时保证了混凝土振捣施工质量,大大提高现场施工效率,节省人力和成本,应用于实际工程中可取得较好的技术经济效益。
Construction method and device for reinforced concrete wrapped steel pipe concrete column
钢筋混凝土外包钢管混凝土柱施工方法及装置
JI JUNFU (author) / SUN XIN'AN (author) / MA QIAN (author) / YAN ZHE (author) / YAN LIXIN (author) / ZHU SHIWEI (author) / LI PENGCHENG (author)
2024-02-23
Patent
Electronic Resource
Chinese
Concrete-wrapped steel pipe concrete combination column and construction method
European Patent Office | 2021
|Construction method of outer wrapped concrete steel pipe composite column
European Patent Office | 2015
|Steel column wrapped reinforced concrete reinforcing structure
European Patent Office | 2021
|Reinforced concrete steel pipe column construction method
European Patent Office | 2015
|Construction process of thin bare concrete wrapped outside ultrahigh steel pipe column
European Patent Office | 2022
|