A platform for research: civil engineering, architecture and urbanism
Crack repairing device and method for highway construction
The crack repairing device for highway construction comprises a pressing plate, a groove is formed in the center of the bottom face of the pressing plate, a grouting pipe is fixedly arranged in the center of the pressing plate in a penetrating mode, the bottom of the grouting pipe communicates with the groove, the top end of the grouting pipe penetrates through the bottom of a storage box, and the top of the grouting pipe is fixedly connected with the storage box. A material guide table is fixedly arranged at the bottom in the material storage box, a material guide groove is formed in the top of the material guide table, and the material guide groove communicates with the top of the grouting pipe. According to the device, the pressing plate is designed to be pressed above the crack, then repairing materials such as asphalt are poured into the crack, the crack can be accurately filled, the flatness of the road surface after filling can be kept, and after the crack is filled, the pressing block can automatically press the controller, so that the controller controls the alarm to give an alarm to remind an operator.
本发明公开了一种公路施工用裂缝修补装置,包括压板,所述压板底面中央开设有凹槽,所述压板中央贯穿固设有注浆管,所述注浆管底部与凹槽连通,所述注浆管顶端贯穿储料箱底部,所述注浆管顶部与储料箱固接,所述储料箱内底部固设有导料台,所述导料台顶部设置有导料槽,所述导料槽与注浆管顶部连通。本发明通过设计压板压在裂缝上方,然后向裂缝内灌注沥青等修补料,不仅可以准确的对裂缝填料,还可以保持填料后路面的平整度,且裂缝被填满后,压块会自动按压控制器,使控制器控制报警器报警提醒操作人员。
Crack repairing device and method for highway construction
The crack repairing device for highway construction comprises a pressing plate, a groove is formed in the center of the bottom face of the pressing plate, a grouting pipe is fixedly arranged in the center of the pressing plate in a penetrating mode, the bottom of the grouting pipe communicates with the groove, the top end of the grouting pipe penetrates through the bottom of a storage box, and the top of the grouting pipe is fixedly connected with the storage box. A material guide table is fixedly arranged at the bottom in the material storage box, a material guide groove is formed in the top of the material guide table, and the material guide groove communicates with the top of the grouting pipe. According to the device, the pressing plate is designed to be pressed above the crack, then repairing materials such as asphalt are poured into the crack, the crack can be accurately filled, the flatness of the road surface after filling can be kept, and after the crack is filled, the pressing block can automatically press the controller, so that the controller controls the alarm to give an alarm to remind an operator.
本发明公开了一种公路施工用裂缝修补装置,包括压板,所述压板底面中央开设有凹槽,所述压板中央贯穿固设有注浆管,所述注浆管底部与凹槽连通,所述注浆管顶端贯穿储料箱底部,所述注浆管顶部与储料箱固接,所述储料箱内底部固设有导料台,所述导料台顶部设置有导料槽,所述导料槽与注浆管顶部连通。本发明通过设计压板压在裂缝上方,然后向裂缝内灌注沥青等修补料,不仅可以准确的对裂缝填料,还可以保持填料后路面的平整度,且裂缝被填满后,压块会自动按压控制器,使控制器控制报警器报警提醒操作人员。
Crack repairing device and method for highway construction
一种公路施工用裂缝修补装置及修补方法
YU JIAN (author) / JI FANGWEI (author) / JIA JIWEN (author)
2024-02-27
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Crack repairing device for highway construction and repairing method thereof
European Patent Office | 2023
|Rapid crack repairing device for asphalt highway construction
European Patent Office | 2023
|Novel crack repairing device for asphalt highway construction
European Patent Office | 2020
|Highway pavement crack repairing device and repairing method
European Patent Office | 2024
|