Steel tower head section mounting equipment and steel tower head section construction method
The invention belongs to the technical field of bridge construction, and discloses steel tower head section mounting equipment and a steel tower head section construction method. The steel tower head section installation equipment comprises a supporting base and a fastening assembly, the supporting base is embedded in a tower base, the face, opposite to a steel tower head section, of the tower base is a first butt joint face, and the face, opposite to the tower base, of the steel tower head section is a second butt joint face; the tower base is used for bearing the steel tower head section so that a connecting cavity can be formed between the first butt joint face and the second butt joint face. A grouting groove is formed in the first butt joint face, the grouting groove and the connecting cavity form a grouting space, the grouting space is used for injecting a filling structure, and the filling structure is attached to and connected with the tower base and the second butt joint face; the fastening assembly is arranged on the tower base and used for fixing the steel tower head section to the supporting base. According to the steel tower head section mounting equipment, the fitting degree of the steel tower head section and the tower base can be improved, and the mounting stability of the steel tower head section is further improved.
本发明属于桥梁施工技术领域,公开了一种钢塔首节段安装设备及钢塔首节段施工方法。该钢塔首节段安装设备包括支承座和紧固组件,支承座埋设在塔座上,塔座上与钢塔首节段相对的面为第一对接面,钢塔首节段上与塔座相对的面为第二对接面;塔座用于承托钢塔首节段,以使第一对接面和第二对接面之间形成连接空腔;第一对接面上开设有注浆凹槽,注浆凹槽与连接空腔组成注浆空间,注浆空间用于注入填充结构,填充结构分别与塔座和第二对接面贴靠并连接;紧固组件设置在塔座上,紧固组件用于将钢塔首节段固定在支承座上。钢塔首节段安装设备能够提高钢塔首节段与塔座的贴合度,进一步提高了钢塔首节段安装的稳定性。
Steel tower head section mounting equipment and steel tower head section construction method
The invention belongs to the technical field of bridge construction, and discloses steel tower head section mounting equipment and a steel tower head section construction method. The steel tower head section installation equipment comprises a supporting base and a fastening assembly, the supporting base is embedded in a tower base, the face, opposite to a steel tower head section, of the tower base is a first butt joint face, and the face, opposite to the tower base, of the steel tower head section is a second butt joint face; the tower base is used for bearing the steel tower head section so that a connecting cavity can be formed between the first butt joint face and the second butt joint face. A grouting groove is formed in the first butt joint face, the grouting groove and the connecting cavity form a grouting space, the grouting space is used for injecting a filling structure, and the filling structure is attached to and connected with the tower base and the second butt joint face; the fastening assembly is arranged on the tower base and used for fixing the steel tower head section to the supporting base. According to the steel tower head section mounting equipment, the fitting degree of the steel tower head section and the tower base can be improved, and the mounting stability of the steel tower head section is further improved.
本发明属于桥梁施工技术领域,公开了一种钢塔首节段安装设备及钢塔首节段施工方法。该钢塔首节段安装设备包括支承座和紧固组件,支承座埋设在塔座上,塔座上与钢塔首节段相对的面为第一对接面,钢塔首节段上与塔座相对的面为第二对接面;塔座用于承托钢塔首节段,以使第一对接面和第二对接面之间形成连接空腔;第一对接面上开设有注浆凹槽,注浆凹槽与连接空腔组成注浆空间,注浆空间用于注入填充结构,填充结构分别与塔座和第二对接面贴靠并连接;紧固组件设置在塔座上,紧固组件用于将钢塔首节段固定在支承座上。钢塔首节段安装设备能够提高钢塔首节段与塔座的贴合度,进一步提高了钢塔首节段安装的稳定性。
Steel tower head section mounting equipment and steel tower head section construction method
钢塔首节段安装设备及钢塔首节段施工方法
PENG ZHICHUAN (author) / LI DONG (author) / XIE DENGKE (author) / SONG CHAO (author) / XU YONGMING (author) / TIAN WEI (author) / LI JIAHENG (author) / ZHANG YIDAN (author) / WANG WENQIANG (author) / SUN HONGWEI (author)
2024-02-27
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Large-section steel tower head section positioning and adjusting device and construction method
European Patent Office | 2024
|European Patent Office | 2024
|Construction method of variable cross-section special-shaped steel tower crown mounting device
European Patent Office | 2023
|Steel-tower winding head frame
Engineering Index Backfile | 1929
|Inclined tower tip steel-concrete combined section construction method
European Patent Office | 2020
|