A platform for research: civil engineering, architecture and urbanism
Guide wall template structure of building partition wall and construction method
The invention relates to a guide wall formwork structure of a building partition wall and a construction method, the guide wall formwork structure comprises a positioning column, a pulling piece and a metal formwork, the bottom end of the positioning column is arranged on a building floor, the pulling piece is arranged on the positioning column, and the two ends of the pulling piece are connected with the metal formwork respectively. According to the guide wall formwork structure of the building partition wall and the construction method, aluminum alloy formwork construction is adopted for guide wall construction, the accuracy of a guide wall construction face can be improved, the phenomenon that the construction face is rough and poor in quality due to the fact that a traditional wood formwork is poor in rigidity and strength is avoided, and the situation that plastering is needed due to the fact that the construction face is uneven is avoided; hidden dangers such as hollowing and cracking are solved, and the construction time is shortened; and on-site wood board cutting is avoided, and the environmental protection property, safety and economical efficiency are improved.
本发明涉及一种建筑隔墙的导墙模板结构及施工方法,包括:定位柱、拉结件和金属模板,所述定位柱底端设置于建筑物楼板上,所述拉结件设置于所述定位柱上,所述拉结件的两端分别连接金属模板。本发明提供的建筑隔墙的导墙模板结构及施工方法,采用铝合金模板施工进行导墙施工,可增加导墙施工面精准,解决由于传统木模板自身刚度、强度差的原因而导致施工面粗糙质量差的现象,免除了因施工面不平整而需抹灰,解决了空鼓开裂等隐患,加快了施工时间;避免现场进行切割木板,增加环保性、安全性以及经济性。
Guide wall template structure of building partition wall and construction method
The invention relates to a guide wall formwork structure of a building partition wall and a construction method, the guide wall formwork structure comprises a positioning column, a pulling piece and a metal formwork, the bottom end of the positioning column is arranged on a building floor, the pulling piece is arranged on the positioning column, and the two ends of the pulling piece are connected with the metal formwork respectively. According to the guide wall formwork structure of the building partition wall and the construction method, aluminum alloy formwork construction is adopted for guide wall construction, the accuracy of a guide wall construction face can be improved, the phenomenon that the construction face is rough and poor in quality due to the fact that a traditional wood formwork is poor in rigidity and strength is avoided, and the situation that plastering is needed due to the fact that the construction face is uneven is avoided; hidden dangers such as hollowing and cracking are solved, and the construction time is shortened; and on-site wood board cutting is avoided, and the environmental protection property, safety and economical efficiency are improved.
本发明涉及一种建筑隔墙的导墙模板结构及施工方法,包括:定位柱、拉结件和金属模板,所述定位柱底端设置于建筑物楼板上,所述拉结件设置于所述定位柱上,所述拉结件的两端分别连接金属模板。本发明提供的建筑隔墙的导墙模板结构及施工方法,采用铝合金模板施工进行导墙施工,可增加导墙施工面精准,解决由于传统木模板自身刚度、强度差的原因而导致施工面粗糙质量差的现象,免除了因施工面不平整而需抹灰,解决了空鼓开裂等隐患,加快了施工时间;避免现场进行切割木板,增加环保性、安全性以及经济性。
Guide wall template structure of building partition wall and construction method
一种建筑隔墙的导墙模板结构及施工方法
ZHU QIUYANG (author) / HE XIAOLEI (author) / YANG KAIWEN (author) / ZHANG JUNCHAO (author) / SHEN YINGCHUN (author) / YANG BIN (author)
2024-02-27
Patent
Electronic Resource
Chinese
PARTITION WALL, BUILDING, AND PARTITION WALL CONSTRUCTION METHOD
European Patent Office | 2024
|PARTITION WALL, CONSTRUCTION METHOD OF PARTITION WALL, AND BUILDING COMPRISING PARTITION WALL
European Patent Office | 2021
|Partition wall construction process and partition wall structure
European Patent Office | 2021
|European Patent Office | 2021
|Building partition wall building construction device and method
European Patent Office | 2023
|