A platform for research: civil engineering, architecture and urbanism
Temporary temporary bridge structure and construction method
The temporary bridge structure comprises a plurality of middle supporting structures, the middle supporting structures are arranged at intervals in the longitudinal bridge direction, and hollow plates are fixed to the top ends of the middle supporting structures; a butt strap is installed at the top end of the end supporting structure, an end baffle is fixed to the end, close to the hollow slab, of the butt strap, and a gap is formed between the end baffle and the hollow slab; the limiting structure is arranged in the gap, the limiting structure comprises connecting profile steel, one end of the connecting profile steel is fixed to the end baffle, and the top end of the connecting profile steel is filled with concrete; and the soil retaining formwork is fixed to the side, away from the middle supporting structure, of the end supporting structure, and one end of the soil retaining formwork makes contact with the butt strap. The hollow slab is fixed to the top end of the middle supporting structure of the temporary bridge structure, so that the hollow slab can serve as a bridge deck structure of a temporary bridge, and higher comfort is achieved when vehicles pass.
本申请涉及一种临时便桥结构及建造方法,其包括:多个中部支撑结构,中部支撑结构沿纵桥向间隔布设,中部支撑结构的顶端固定有空心板;端部支撑结构,端部支撑结构的顶端安装有搭板,搭板靠近空心板的一端固定有端挡板,端挡板与空心板之间形成间隙;限位结构,限位结构设于间隙内,限位结构包括连接型钢,连接型钢的一端固定于端挡板,连接型钢的顶端填充有混凝土;挡土模板,挡土模板固定于端部支撑结构远离中部支撑结构的一侧,且挡土模板的一端与搭板接触。通过在临时便桥结构的中部支撑结构的顶端固定空心板,可以使得空心板作为临时桥梁的桥面结构,使车辆通行时有更高的舒适性。
Temporary temporary bridge structure and construction method
The temporary bridge structure comprises a plurality of middle supporting structures, the middle supporting structures are arranged at intervals in the longitudinal bridge direction, and hollow plates are fixed to the top ends of the middle supporting structures; a butt strap is installed at the top end of the end supporting structure, an end baffle is fixed to the end, close to the hollow slab, of the butt strap, and a gap is formed between the end baffle and the hollow slab; the limiting structure is arranged in the gap, the limiting structure comprises connecting profile steel, one end of the connecting profile steel is fixed to the end baffle, and the top end of the connecting profile steel is filled with concrete; and the soil retaining formwork is fixed to the side, away from the middle supporting structure, of the end supporting structure, and one end of the soil retaining formwork makes contact with the butt strap. The hollow slab is fixed to the top end of the middle supporting structure of the temporary bridge structure, so that the hollow slab can serve as a bridge deck structure of a temporary bridge, and higher comfort is achieved when vehicles pass.
本申请涉及一种临时便桥结构及建造方法,其包括:多个中部支撑结构,中部支撑结构沿纵桥向间隔布设,中部支撑结构的顶端固定有空心板;端部支撑结构,端部支撑结构的顶端安装有搭板,搭板靠近空心板的一端固定有端挡板,端挡板与空心板之间形成间隙;限位结构,限位结构设于间隙内,限位结构包括连接型钢,连接型钢的一端固定于端挡板,连接型钢的顶端填充有混凝土;挡土模板,挡土模板固定于端部支撑结构远离中部支撑结构的一侧,且挡土模板的一端与搭板接触。通过在临时便桥结构的中部支撑结构的顶端固定空心板,可以使得空心板作为临时桥梁的桥面结构,使车辆通行时有更高的舒适性。
Temporary temporary bridge structure and construction method
一种临时便桥结构及建造方法
WANG XIAODONG (author) / XIONG RUI (author) / ZENG XIANYI (author) / CAO CHUNMING (author) / LUO YI (author) / YE JUNMING (author) / YU ZHIJIE (author) / YANG YUN (author)
2024-03-05
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
TEMPORARY BRIDGE AND CONSTRUCTION METHOD FOR TEMPORARY BRIDGE
European Patent Office | 2020
|TEMPORARY BRIDGE AND CONSTRUCTION METHOD OF TEMPORARY BRIDGE
European Patent Office | 2023
|A TEMPORARY BRIDGE AND CONSTRUCTION METHOD FOR THE TEMPORARY BRIDGE
European Patent Office | 2021
|