A TEMPORARY BRIDGE AND CONSTRUCTION METHOD FOR THE TEMPORARY BRIDGE
An embodiment of the present invention provides a girder. In the girder for a temporary bridge, the girder includes an upper flange, a lower flange, and a web connecting the upper and lower flanges. The girder is introduced with preflextion. On the girder, three or more vertical reinforcements and a plurality of horizontal reinforcements are installed. The three or more vertical reinforcements connect the upper flange and the lower flange in a height direction, and are installed to be spaced apart from each other in a longitudinal direction of the girder. The plurality of horizontal reinforcements are respectively installed on the upper flange and the lower flange to maintain the preflextion introduced into the girder, and connect the pair of vertical reinforcements, adjacent to each other, in the longitudinal direction. The horizontal reinforcement is formed of L-shaped steel having a length of 10% to 35% of the length of the girder. One edge of the horizontal reinforcement is connected to the upper flange or the lower flange so that a closed space is formed between the girder and the horizontal reinforcement, and the other edge is connected to a web. The girder is introduced with the preflextion in a state in which the vertical reinforcement is installed. The horizontal reinforcement formed to have the same curvature as the girder to which the preflextion is introduced is installed in the girder to which the preflextion is introduced. To prevent the longitudinal both ends of the horizontal reinforcement from being spaced apart from the upper flange or the lower flange, the pair of vertical reinforcement disposed at both longitudinal ends of the horizontal reinforcement can be connected to both longitudinal ends of the horizontal reinforcement, respectively. The present invention can improve the safety of the temporary bridge.
본 발명의 일 실시예는 거더가 제공된다. 가설교량용 거더에 있어서, 상기 거더는 상부 플랜지, 하부 플랜지, 및 이들을 연결하는 웹을 포함하고, 상기 거더는 프리플렉션이 도입되며, 상기 거더에, 상기 상부 플랜지와 상기 하부 플랜지를 높이방향으로 연결하며, 상기 거더의 길이방향을 따라 서로 이격되어 설치되는 세 개 이상의 수직보강재; 및 상기 거더에 도입된 프리플렉션을 유지하기 위해 상기 상부 플랜지 및 상기 하부 플랜지에 각각 설치되되, 서로 인접하는 한 쌍의 상기 수직보강재 사이를 길이방향으로 연결하는 복수 개의 수평보강재; 가 설치되며, 상기 수평보강재는 상기 거더의 길이의 10% 내지 35%의 길이를 갖는 L형강으로 형성되고, 상기 거더와 상기 수평보강재 사이에 폐합공간이 형성되도록 상기 수평보강재의 일측 모서리는 상기 상부 플랜지 또는 상기 하부 플랜지에 연결되며, 타측 모서리는 상기 웹에 연결되고, 상기 거더는 상기 수직보강재가 설치된 상태에서 상기 프리플렉션이 도입되고, 상기 프리플렉션이 도입된 상기 거더와 동일한 곡률을 갖도록 형성된 상기 수평보강재가 상기 프리플렉션이 도입된 상기 거더에 설치되고, 상기 수평보강재의 길이방향 양단부가 상기 상부 플랜지 또는 상기 하부 플랜지로부터 이격되는 것을 방지하도록 상기 수평보강재의 길이방향 양단부에 배치되는 한 쌍의 상기 수직보강재는 상기 수평보강재의 길이방향 양단부와 각각 연결될 수 있다.
A TEMPORARY BRIDGE AND CONSTRUCTION METHOD FOR THE TEMPORARY BRIDGE
An embodiment of the present invention provides a girder. In the girder for a temporary bridge, the girder includes an upper flange, a lower flange, and a web connecting the upper and lower flanges. The girder is introduced with preflextion. On the girder, three or more vertical reinforcements and a plurality of horizontal reinforcements are installed. The three or more vertical reinforcements connect the upper flange and the lower flange in a height direction, and are installed to be spaced apart from each other in a longitudinal direction of the girder. The plurality of horizontal reinforcements are respectively installed on the upper flange and the lower flange to maintain the preflextion introduced into the girder, and connect the pair of vertical reinforcements, adjacent to each other, in the longitudinal direction. The horizontal reinforcement is formed of L-shaped steel having a length of 10% to 35% of the length of the girder. One edge of the horizontal reinforcement is connected to the upper flange or the lower flange so that a closed space is formed between the girder and the horizontal reinforcement, and the other edge is connected to a web. The girder is introduced with the preflextion in a state in which the vertical reinforcement is installed. The horizontal reinforcement formed to have the same curvature as the girder to which the preflextion is introduced is installed in the girder to which the preflextion is introduced. To prevent the longitudinal both ends of the horizontal reinforcement from being spaced apart from the upper flange or the lower flange, the pair of vertical reinforcement disposed at both longitudinal ends of the horizontal reinforcement can be connected to both longitudinal ends of the horizontal reinforcement, respectively. The present invention can improve the safety of the temporary bridge.
본 발명의 일 실시예는 거더가 제공된다. 가설교량용 거더에 있어서, 상기 거더는 상부 플랜지, 하부 플랜지, 및 이들을 연결하는 웹을 포함하고, 상기 거더는 프리플렉션이 도입되며, 상기 거더에, 상기 상부 플랜지와 상기 하부 플랜지를 높이방향으로 연결하며, 상기 거더의 길이방향을 따라 서로 이격되어 설치되는 세 개 이상의 수직보강재; 및 상기 거더에 도입된 프리플렉션을 유지하기 위해 상기 상부 플랜지 및 상기 하부 플랜지에 각각 설치되되, 서로 인접하는 한 쌍의 상기 수직보강재 사이를 길이방향으로 연결하는 복수 개의 수평보강재; 가 설치되며, 상기 수평보강재는 상기 거더의 길이의 10% 내지 35%의 길이를 갖는 L형강으로 형성되고, 상기 거더와 상기 수평보강재 사이에 폐합공간이 형성되도록 상기 수평보강재의 일측 모서리는 상기 상부 플랜지 또는 상기 하부 플랜지에 연결되며, 타측 모서리는 상기 웹에 연결되고, 상기 거더는 상기 수직보강재가 설치된 상태에서 상기 프리플렉션이 도입되고, 상기 프리플렉션이 도입된 상기 거더와 동일한 곡률을 갖도록 형성된 상기 수평보강재가 상기 프리플렉션이 도입된 상기 거더에 설치되고, 상기 수평보강재의 길이방향 양단부가 상기 상부 플랜지 또는 상기 하부 플랜지로부터 이격되는 것을 방지하도록 상기 수평보강재의 길이방향 양단부에 배치되는 한 쌍의 상기 수직보강재는 상기 수평보강재의 길이방향 양단부와 각각 연결될 수 있다.
A TEMPORARY BRIDGE AND CONSTRUCTION METHOD FOR THE TEMPORARY BRIDGE
가설교량 및 이의 시공방법
JUNG DONG JIN (author)
2021-09-13
Patent
Electronic Resource
Korean
IPC:
E01D
BRIDGES
,
Brücken
TEMPORARY BRIDGE AND CONSTRUCTION METHOD FOR TEMPORARY BRIDGE
European Patent Office | 2020
|TEMPORARY BRIDGE AND CONSTRUCTION METHOD OF TEMPORARY BRIDGE
European Patent Office | 2023
|Temporary temporary bridge structure and construction method
European Patent Office | 2024
|A TEMPORARY BRIDGE AND CONSTRUCTION METHOD FOR THE TEMPORARY BRIDGE
European Patent Office | 2022