Continuous rising construction method for high rising layer of roller compacted concrete dam
The invention discloses a continuous rising construction method for a high rising layer of a roller compacted concrete dam. The continuous rising construction method comprises the steps of construction preparation, early-stage warehouse preparation construction, warehouse surface acceptance inspection, concrete pouring, remaining height warehouse preparation construction, process acceptance inspection, continuous concrete pouring and concrete curing. Before concrete pouring, only part of the height standby bins are checked and accepted, namely, bin opening construction is conducted, the remaining height standby bins are completed during concrete pouring, unlimited continuous rising can be achieved under the condition that no special structure needs to stop the bins, the number of cold rising layers is reduced, meanwhile, rolling supervision and rolling layer temperature control are combined, and the construction efficiency is improved. Important parameters of concrete construction are supervised, prompted and fed back, the interlayer combination quality of the concrete is guaranteed, the warehouse preparation time is shortened, the construction progress is accelerated, and the requirement for long-period non-intermittent continuous rising of dam concrete in the low-temperature season is met.
本发明公开了一种碾压混凝土坝高升层连续上升施工方法,其包括施工准备、前期备仓施工、仓面验收、混凝土浇筑、剩余高度备仓施工、过程验收、继续浇筑混凝土及混凝土养护。本发明在混凝土浇筑前只进行部分高度备仓验收即开仓施工,剩余高度备仓在混凝土浇筑期间完成,在无特殊结构需要停仓条件下,能够无限制连续上升,减少了冷升层数量,同时结合碾压监管、碾压层温控,对混凝土施工重要参数进行监管提示及反馈,保证了混凝土层间结合质量,缩短了备仓时间,加快了施工进度,满足了低温季节大坝混凝土长周期不间歇连续上升的要求。
Continuous rising construction method for high rising layer of roller compacted concrete dam
The invention discloses a continuous rising construction method for a high rising layer of a roller compacted concrete dam. The continuous rising construction method comprises the steps of construction preparation, early-stage warehouse preparation construction, warehouse surface acceptance inspection, concrete pouring, remaining height warehouse preparation construction, process acceptance inspection, continuous concrete pouring and concrete curing. Before concrete pouring, only part of the height standby bins are checked and accepted, namely, bin opening construction is conducted, the remaining height standby bins are completed during concrete pouring, unlimited continuous rising can be achieved under the condition that no special structure needs to stop the bins, the number of cold rising layers is reduced, meanwhile, rolling supervision and rolling layer temperature control are combined, and the construction efficiency is improved. Important parameters of concrete construction are supervised, prompted and fed back, the interlayer combination quality of the concrete is guaranteed, the warehouse preparation time is shortened, the construction progress is accelerated, and the requirement for long-period non-intermittent continuous rising of dam concrete in the low-temperature season is met.
本发明公开了一种碾压混凝土坝高升层连续上升施工方法,其包括施工准备、前期备仓施工、仓面验收、混凝土浇筑、剩余高度备仓施工、过程验收、继续浇筑混凝土及混凝土养护。本发明在混凝土浇筑前只进行部分高度备仓验收即开仓施工,剩余高度备仓在混凝土浇筑期间完成,在无特殊结构需要停仓条件下,能够无限制连续上升,减少了冷升层数量,同时结合碾压监管、碾压层温控,对混凝土施工重要参数进行监管提示及反馈,保证了混凝土层间结合质量,缩短了备仓时间,加快了施工进度,满足了低温季节大坝混凝土长周期不间歇连续上升的要求。
Continuous rising construction method for high rising layer of roller compacted concrete dam
一种碾压混凝土坝高升层连续上升施工方法
WU DUDU (author) / LUO CHANGQING (author) / ZHOU HUA (author) / DUAN CHUAN (author) / HOU LIAN (author) / ZHAO MINGXUAN (author) / WANG QIUYANG (author) / YUE GUIPEI (author) / WEI DAHAN (author) / NI LEI (author)
2024-03-12
Patent
Electronic Resource
Chinese
ROLLER COMPACTED CONCRETE MATERIAL MIXING METHOD AND ROLLER COMPACTED CONCRETE
European Patent Office | 2021
|Roller-compacted concrete pavements and concrete construction
UB Braunschweig | 1986
|Dam roller compacted concrete rollover construction method
European Patent Office | 2023
|