A platform for research: civil engineering, architecture and urbanism
Section steel concrete frame internally tangent hemispherical shell structure and construction method thereof
The invention relates to a steel reinforced concrete frame internally tangent hemispherical shell structure and a construction method thereof. The construction method comprises the specific steps that a supporting structure of a shell is built according to a target position; the shell is poured to the half height position; a first-layer main body structure and a first-layer section steel column are arranged on the ground of the side, away from the opening, of the shell; the rest half of the shell is poured; a main body structure above the shell is constructed, and the main body structure is fixedly connected with the section steel column; building a roof structure at the top ends of the section steel columns; and after the pouring object in the shell is solidified, the supporting structure of the shell is dismantled, and construction of the internally tangent shell structure of the steel reinforced concrete frame is completed. According to the construction method of the internally tangent hemispherical shell structure of the steel reinforced concrete frame, segmented construction is conducted from bottom to top, the construction quality of a building can be guaranteed, the shell is poured by arranging the supporting structure, the quality of the shell can be guaranteed, and safety is improved.
本发明涉及一种型钢混凝土框架内切半球形壳体结构及其施工方法,具体步骤包括:根据目标位置搭建壳体的支撑结构;将壳体浇筑到二分之一的高度位置;在壳体远离开口一侧的地面设置第一层主体结构以及第一层型钢柱;将壳体剩余的二分之一浇筑完成;施工壳体上方的主体结构,并将主体结构与型钢柱固定连接;在型钢柱的顶端搭建屋顶结构;等壳体内的浇筑物凝固后,拆除壳体的支撑结构,即完成对型钢混凝土框架内切壳体结构的施工。本发明一种型钢混凝土框架内切半球形壳体结构的施工方法中,从下至上分段施工,可以保证建筑的施工质量,且通过设置支撑结构来浇筑壳体,能够保证壳体的质量,提高安全性。
Section steel concrete frame internally tangent hemispherical shell structure and construction method thereof
The invention relates to a steel reinforced concrete frame internally tangent hemispherical shell structure and a construction method thereof. The construction method comprises the specific steps that a supporting structure of a shell is built according to a target position; the shell is poured to the half height position; a first-layer main body structure and a first-layer section steel column are arranged on the ground of the side, away from the opening, of the shell; the rest half of the shell is poured; a main body structure above the shell is constructed, and the main body structure is fixedly connected with the section steel column; building a roof structure at the top ends of the section steel columns; and after the pouring object in the shell is solidified, the supporting structure of the shell is dismantled, and construction of the internally tangent shell structure of the steel reinforced concrete frame is completed. According to the construction method of the internally tangent hemispherical shell structure of the steel reinforced concrete frame, segmented construction is conducted from bottom to top, the construction quality of a building can be guaranteed, the shell is poured by arranging the supporting structure, the quality of the shell can be guaranteed, and safety is improved.
本发明涉及一种型钢混凝土框架内切半球形壳体结构及其施工方法,具体步骤包括:根据目标位置搭建壳体的支撑结构;将壳体浇筑到二分之一的高度位置;在壳体远离开口一侧的地面设置第一层主体结构以及第一层型钢柱;将壳体剩余的二分之一浇筑完成;施工壳体上方的主体结构,并将主体结构与型钢柱固定连接;在型钢柱的顶端搭建屋顶结构;等壳体内的浇筑物凝固后,拆除壳体的支撑结构,即完成对型钢混凝土框架内切壳体结构的施工。本发明一种型钢混凝土框架内切半球形壳体结构的施工方法中,从下至上分段施工,可以保证建筑的施工质量,且通过设置支撑结构来浇筑壳体,能够保证壳体的质量,提高安全性。
Section steel concrete frame internally tangent hemispherical shell structure and construction method thereof
一种型钢混凝土框架内切半球形壳体结构及其施工方法
CHEN LIN (author) / OUYANG KANG (author) / LIU SHANFENG (author) / TANG HAOMING (author) / WEI XINGYUN (author)
2024-03-15
Patent
Electronic Resource
Chinese
Concrete supporting structure internally inserted with profile steel and construction method thereof
European Patent Office | 2022
|STEEL FRAME CONCRETE BEAM STRUCTURE AND CONSTRUCTION METHOD OF STEEL FRAME CONCRETE BEAM STRUCTURE
European Patent Office | 2022
|Fabricated steel rib connection concrete frame structure and construction method thereof
European Patent Office | 2024
|Construction method of fabricated internally-inserted section steel underground diaphragm wall
European Patent Office | 2022
|