A platform for research: civil engineering, architecture and urbanism
Concrete construction elevation control device and control method
The invention discloses a concrete construction elevation control device and method, the concrete construction elevation control device comprises a handle, a sleeve, a screw rod, a reference rod piece, a connecting rod piece, a jaw clamp and a fixing bolt, the sleeve is of a threaded structure, the sleeve is connected to the screw rod in a sleeving mode, the handle, the screw rod and the reference rod piece are sequentially connected, the connecting rod piece is vertically welded to one side of the sleeve, and the jaw clamp is arranged on the other side of the sleeve. The jaw clamp is welded to the end of the connecting rod piece, and the fixing bolt is connected to the end of the jaw clamp through a bolt. The device can be attached to multiple positions of vertical steel bars, the standard rod pieces are arranged in a line and matched with a jaw clamp, the concrete elevation and flatness control quality and the construction efficiency are greatly improved, meanwhile, the device is detachable, capable of being repeatedly used, convenient to operate, simple, practical and high in construction speed, and the engineering construction cost is reduced.
本发明公开了一种混凝土施工标高控制装置及控制方法,包括手柄、套筒、螺杆、基准杆件、连接杆件、虎口夹和固定螺栓,所述套筒内部为螺纹结构,套筒套接在螺杆上,所述手柄、螺杆和基准杆件依次连接,所述连接杆件垂直焊接在套筒的一侧,所述连接杆件的端部焊接虎口夹,所述固定螺栓螺栓连接在虎口夹的端部。本发明能够依附竖向钢筋多处设置,且基准杆件成一条线,与虎口夹配合,大幅提高混凝土标高和平整度控制质量和施工效率,同时本发明可拆卸,能够重复利用,便于操作,简单实用,施工速度快,降低了工程施工成本。
Concrete construction elevation control device and control method
The invention discloses a concrete construction elevation control device and method, the concrete construction elevation control device comprises a handle, a sleeve, a screw rod, a reference rod piece, a connecting rod piece, a jaw clamp and a fixing bolt, the sleeve is of a threaded structure, the sleeve is connected to the screw rod in a sleeving mode, the handle, the screw rod and the reference rod piece are sequentially connected, the connecting rod piece is vertically welded to one side of the sleeve, and the jaw clamp is arranged on the other side of the sleeve. The jaw clamp is welded to the end of the connecting rod piece, and the fixing bolt is connected to the end of the jaw clamp through a bolt. The device can be attached to multiple positions of vertical steel bars, the standard rod pieces are arranged in a line and matched with a jaw clamp, the concrete elevation and flatness control quality and the construction efficiency are greatly improved, meanwhile, the device is detachable, capable of being repeatedly used, convenient to operate, simple, practical and high in construction speed, and the engineering construction cost is reduced.
本发明公开了一种混凝土施工标高控制装置及控制方法,包括手柄、套筒、螺杆、基准杆件、连接杆件、虎口夹和固定螺栓,所述套筒内部为螺纹结构,套筒套接在螺杆上,所述手柄、螺杆和基准杆件依次连接,所述连接杆件垂直焊接在套筒的一侧,所述连接杆件的端部焊接虎口夹,所述固定螺栓螺栓连接在虎口夹的端部。本发明能够依附竖向钢筋多处设置,且基准杆件成一条线,与虎口夹配合,大幅提高混凝土标高和平整度控制质量和施工效率,同时本发明可拆卸,能够重复利用,便于操作,简单实用,施工速度快,降低了工程施工成本。
Concrete construction elevation control device and control method
一种混凝土施工标高控制装置及控制方法
XU BINBIN (author) / ZHU PENG (author) / FENG ZHIYONG (author) / XIAO KAI (author)
2024-03-15
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Concrete elevation control device and construction method
European Patent Office | 2024
|Cement concrete pavement elevation control structure and construction method thereof
European Patent Office | 2021
|