A platform for research: civil engineering, architecture and urbanism
Fan foundation pile stabilizing platform and construction method
The invention discloses a fan foundation pile stabilizing platform and a construction method, the fan foundation pile stabilizing platform comprises a stabilizing assembly, the stabilizing assembly comprises an anti-sinking plate, a sleeve, a fixing frame, a guide sleeve, a supporting platform and a connecting piece, the sleeve is fixed on the top of the anti-sinking plate, the fixing frame is fixed on the outer side of the sleeve, the guide sleeve is fixed on the fixing frame, and the connecting piece is fixed on the supporting platform. The supporting platform is arranged above the sleeve, the connecting piece is located between the sleeve and the supporting platform, and a positioning hole is formed in the supporting platform. The device has the beneficial effects that through the arrangement of the stabilizing assembly, in the foundation pile construction process, multiple foundation piles can be positioned, the situation that the foundation piles collide in the construction process can be avoided, the horizontal state of the stabilizing assembly can be adjusted, and therefore the multiple foundation piles can be in the vertical state at the same time; therefore, the construction difficulty and time cost can be reduced, and the construction efficiency is improved.
本发明公开了一种风机基桩稳固平台及施工方法,包括稳定组件,包括防沉板、套管、固定架、导向套管、支撑平台以及连接件,所述套管固定于所述防沉板顶部,所述固定架固定于所述套管外侧,所述导向套管固定于所述固定架上,所述支撑平台设置于所述套管上方,所述连接件位于所述套管和所述支撑平台之间,所述支撑平台上开设有定位孔。本发明有益效果为:通过稳定组件的设置,在对基桩施工过程中,可对多个基桩进行定位,可避免基桩在施工过程中会发生撞击的情况,且能够对稳定组件的水平状态进行调节,以此可使多个基桩同时处于竖直状态,以此可降低施工难度和时间成本,提高施工效率。
Fan foundation pile stabilizing platform and construction method
The invention discloses a fan foundation pile stabilizing platform and a construction method, the fan foundation pile stabilizing platform comprises a stabilizing assembly, the stabilizing assembly comprises an anti-sinking plate, a sleeve, a fixing frame, a guide sleeve, a supporting platform and a connecting piece, the sleeve is fixed on the top of the anti-sinking plate, the fixing frame is fixed on the outer side of the sleeve, the guide sleeve is fixed on the fixing frame, and the connecting piece is fixed on the supporting platform. The supporting platform is arranged above the sleeve, the connecting piece is located between the sleeve and the supporting platform, and a positioning hole is formed in the supporting platform. The device has the beneficial effects that through the arrangement of the stabilizing assembly, in the foundation pile construction process, multiple foundation piles can be positioned, the situation that the foundation piles collide in the construction process can be avoided, the horizontal state of the stabilizing assembly can be adjusted, and therefore the multiple foundation piles can be in the vertical state at the same time; therefore, the construction difficulty and time cost can be reduced, and the construction efficiency is improved.
本发明公开了一种风机基桩稳固平台及施工方法,包括稳定组件,包括防沉板、套管、固定架、导向套管、支撑平台以及连接件,所述套管固定于所述防沉板顶部,所述固定架固定于所述套管外侧,所述导向套管固定于所述固定架上,所述支撑平台设置于所述套管上方,所述连接件位于所述套管和所述支撑平台之间,所述支撑平台上开设有定位孔。本发明有益效果为:通过稳定组件的设置,在对基桩施工过程中,可对多个基桩进行定位,可避免基桩在施工过程中会发生撞击的情况,且能够对稳定组件的水平状态进行调节,以此可使多个基桩同时处于竖直状态,以此可降低施工难度和时间成本,提高施工效率。
Fan foundation pile stabilizing platform and construction method
一种风机基桩稳固平台及施工方法
YANG TONGWU (author) / SHANG FAHUI (author) / FENG LIANG (author) / WANG DONGXIANG (author)
2024-03-19
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Offshore wind power underwater four-pile jacket foundation construction pile stabilizing platform
European Patent Office | 2024
|Pile foundation construction platform and pile foundation construction method
European Patent Office | 2023
|Pile foundation construction platform and pile foundation construction method
European Patent Office | 2020
|Pile foundation construction platform and pile foundation construction method
European Patent Office | 2024
|