A platform for research: civil engineering, architecture and urbanism
Pile stabilizing platform and construction method
The invention discloses a pile stabilizing platform and a construction method, and the construction method comprises the following steps: 1, determining a large component which comprises a top layer platform, a limiting cylinder, an auxiliary pile sleeve, an auxiliary pile, a supporting steel pipe between the auxiliary pile sleeve and an anti-sinking platform, 2, manufacturing the large component and arranging a lifting lug on the large component, 3, manufacturing a large folding gantry stool and arranging in place, and 4, assembling the large folding gantry stool. (4) turning over the anti-sinking platform and folding a gantry placing stool; (5) manufacturing a middle sheet body; (6) folding a limiting cylinder and the middle sheet body; (7) folding the middle sheet body and the anti-sinking platform; the overall size of the pile stabilizing platform is checked, and the installation integrity of the remaining accessory components is checked; through inter-process interpenetration operation and inter-step interpenetration operation, the construction efficiency of the pile stabilizing platform is greatly improved, and it is guaranteed that products are delivered on time in a short period with the quality guaranteed.
本发明公开了一种稳桩平台及建造方法,包括流程一,确认大构件,所述大构件包括:顶层平台,限位筒,辅助桩套筒,辅助桩,辅助桩套筒间支撑钢管,防沉平台,流程二,制作大构件并在大构件上布置吊耳,流程三,制作大合拢龙门搁凳,并布置到位,流程四,防沉平台翻身上合拢龙门搁凳,流程五,中间片体制作,流程六,限位筒与中间片体合拢,流程七,中间片体与防沉平台合拢,流程八,顶层平台合拢,流程九,所有结构焊接完成后,对所有合拢位置的油漆修补完成,流程十,检查稳桩平台的整体尺寸,检查剩余附属构件的安装完整性;通过流程间穿插作业和步骤间穿插作业,大大提高了稳桩平台的建造效率,保证了产品短周期内保质按时交货。
Pile stabilizing platform and construction method
The invention discloses a pile stabilizing platform and a construction method, and the construction method comprises the following steps: 1, determining a large component which comprises a top layer platform, a limiting cylinder, an auxiliary pile sleeve, an auxiliary pile, a supporting steel pipe between the auxiliary pile sleeve and an anti-sinking platform, 2, manufacturing the large component and arranging a lifting lug on the large component, 3, manufacturing a large folding gantry stool and arranging in place, and 4, assembling the large folding gantry stool. (4) turning over the anti-sinking platform and folding a gantry placing stool; (5) manufacturing a middle sheet body; (6) folding a limiting cylinder and the middle sheet body; (7) folding the middle sheet body and the anti-sinking platform; the overall size of the pile stabilizing platform is checked, and the installation integrity of the remaining accessory components is checked; through inter-process interpenetration operation and inter-step interpenetration operation, the construction efficiency of the pile stabilizing platform is greatly improved, and it is guaranteed that products are delivered on time in a short period with the quality guaranteed.
本发明公开了一种稳桩平台及建造方法,包括流程一,确认大构件,所述大构件包括:顶层平台,限位筒,辅助桩套筒,辅助桩,辅助桩套筒间支撑钢管,防沉平台,流程二,制作大构件并在大构件上布置吊耳,流程三,制作大合拢龙门搁凳,并布置到位,流程四,防沉平台翻身上合拢龙门搁凳,流程五,中间片体制作,流程六,限位筒与中间片体合拢,流程七,中间片体与防沉平台合拢,流程八,顶层平台合拢,流程九,所有结构焊接完成后,对所有合拢位置的油漆修补完成,流程十,检查稳桩平台的整体尺寸,检查剩余附属构件的安装完整性;通过流程间穿插作业和步骤间穿插作业,大大提高了稳桩平台的建造效率,保证了产品短周期内保质按时交货。
Pile stabilizing platform and construction method
一种稳桩平台及建造方法
YE ZHENG (author) / SHEN PEI (author) / GE BIN (author) / ZHANG HUIMIN (author) / YANG ZHAO (author) / HUANG PENGFEI (author)
2023-04-11
Patent
Electronic Resource
Chinese
Fan foundation pile stabilizing platform and construction method
European Patent Office | 2024
|Construction method of large-diameter single-pile stabilizing platform
European Patent Office | 2021
|Pile machine for offshore wind power floating type pile stabilizing platform construction
European Patent Office | 2023
|