A platform for research: civil engineering, architecture and urbanism
Slope protection concrete climbing formwork
The slope protection concrete climbing formwork comprises a climbing frame, a formwork frame arranged at the bottom of the climbing frame in a sliding mode and a lifting device for driving the climbing frame and the formwork frame to climb, jacks are arranged at the bottoms of the upper end and the lower end of the climbing frame, and a platform cantilever frame is arranged at the top end of the climbing frame; the formwork frame comprises a formwork, a secondary ridge fixedly connected with the back face of the formwork and a main ridge perpendicularly connected with the side, away from the formwork, of the secondary ridge, and the length direction of the main ridge is the same as the climbing direction of the climbing frame. A first pull ring is arranged at the upper end of the main ridge, a supporting corner is arranged at the lower end of the main ridge, and the supporting corner is detachably connected with the climbing frame through a bolt; according to the slope protection concrete climbing formwork, the formwork frame is arranged at the bottom of the climbing frame in the sliding mode, pouring of inclined broken faces can be sequentially conducted from bottom to top through hoisting of the lifting device, hoisting equipment is not needed, the use cost of the equipment is saved, meanwhile, the construction efficiency is remarkably improved, and the slope protection concrete climbing formwork has good reliability and safety.
本发明涉及一种护坡混凝土爬坡模架,包括爬升架、滑动设置于爬升架底部的模板架、驱动爬升架和模板架爬升的提升装置,所述爬升架的上下两端的底部设置有千斤顶,所述爬升架的顶端设置有平台挑架;所述模板架包括模板、与模板背面固定连接的次楞、与次楞的远离模板的一侧垂直连接的主楞,所述主楞的长度方向与爬升架的爬升方向相同;所述主楞的上端设置有第一拉环,所述主楞的下端设置有一托角,所述托角通过螺栓与爬升架可拆卸连接;本护坡混凝土爬坡模架将模板架滑动设置于爬升架的底部,通过提升装置的吊拉,可以依次从下往上进行斜破面的浇筑,无需起吊设备,不仅节约设备使用成本,同时施工效率得到显著提升,具有很好的可靠性和安全性。
Slope protection concrete climbing formwork
The slope protection concrete climbing formwork comprises a climbing frame, a formwork frame arranged at the bottom of the climbing frame in a sliding mode and a lifting device for driving the climbing frame and the formwork frame to climb, jacks are arranged at the bottoms of the upper end and the lower end of the climbing frame, and a platform cantilever frame is arranged at the top end of the climbing frame; the formwork frame comprises a formwork, a secondary ridge fixedly connected with the back face of the formwork and a main ridge perpendicularly connected with the side, away from the formwork, of the secondary ridge, and the length direction of the main ridge is the same as the climbing direction of the climbing frame. A first pull ring is arranged at the upper end of the main ridge, a supporting corner is arranged at the lower end of the main ridge, and the supporting corner is detachably connected with the climbing frame through a bolt; according to the slope protection concrete climbing formwork, the formwork frame is arranged at the bottom of the climbing frame in the sliding mode, pouring of inclined broken faces can be sequentially conducted from bottom to top through hoisting of the lifting device, hoisting equipment is not needed, the use cost of the equipment is saved, meanwhile, the construction efficiency is remarkably improved, and the slope protection concrete climbing formwork has good reliability and safety.
本发明涉及一种护坡混凝土爬坡模架,包括爬升架、滑动设置于爬升架底部的模板架、驱动爬升架和模板架爬升的提升装置,所述爬升架的上下两端的底部设置有千斤顶,所述爬升架的顶端设置有平台挑架;所述模板架包括模板、与模板背面固定连接的次楞、与次楞的远离模板的一侧垂直连接的主楞,所述主楞的长度方向与爬升架的爬升方向相同;所述主楞的上端设置有第一拉环,所述主楞的下端设置有一托角,所述托角通过螺栓与爬升架可拆卸连接;本护坡混凝土爬坡模架将模板架滑动设置于爬升架的底部,通过提升装置的吊拉,可以依次从下往上进行斜破面的浇筑,无需起吊设备,不仅节约设备使用成本,同时施工效率得到显著提升,具有很好的可靠性和安全性。
Slope protection concrete climbing formwork
一种护坡混凝土爬坡模架
FENG SHENGXI (author) / YAN HUA (author)
2024-03-19
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Wall protection device and climbing device for climbing formwork
European Patent Office | 2022
|Hydraulic climbing formwork and climbing formwork construction method
European Patent Office | 2021
|