Hole-reserved open caisson construction method
The invention provides a reserved hole open caisson construction method which comprises the steps that a construction area is measured, a base is excavated and leveled, and sand and plain concrete cushion work is carried out; binding a first section of reinforcing steel bars on the base paved with the sand and plain concrete cushion layer according to a construction drawing; a wooden plug is manufactured, cement mortar is poured into the wooden plug, and the formwork and the wooden plug are installed according to a construction drawing; concrete pouring and curing work is conducted in the installed formwork, a first section of well wall is formed, and soil backfilling and tamping are conducted on the periphery of the first section of well wall; the first section of well wall is excavated to sink, measurement and deviation rectification are conducted in time, and the next section of well wall is manufactured; earth is excavated to sink the open caisson to the designed elevation, open caisson bottom sealing and top plate construction are carried out to form a complete open caisson, and the remaining well wall and a middle-layer plate are backfilled; the construction period of the open caisson is shortened, and manual labor is saved.
本发明提供预留孔洞沉井施工工法,包括:对施工区域进行测量,开挖基底并整平基底,进行砂、素砼垫层工作;按照施工图纸在铺好砂、素砼垫层的基底上进行第一节钢筋绑扎工作;制作木质封堵塞,向木质封堵塞灌注水泥砂浆,按照施工图纸安装模板和木质封堵塞;向安装好的模板内进行混凝土浇筑养护工作,形成第一节井壁,对第一节井壁四周进行回填土并夯实;对第一节井壁挖土下沉并及时进行测量纠偏工作,进行下一节井壁制作;挖土下沉沉井到达设计高程,进行沉井封底与顶板施工形成完整沉井,对剩余井壁、中层板进行回填工作;本发明缩短了沉井施工工期,节省了人力劳动。
Hole-reserved open caisson construction method
The invention provides a reserved hole open caisson construction method which comprises the steps that a construction area is measured, a base is excavated and leveled, and sand and plain concrete cushion work is carried out; binding a first section of reinforcing steel bars on the base paved with the sand and plain concrete cushion layer according to a construction drawing; a wooden plug is manufactured, cement mortar is poured into the wooden plug, and the formwork and the wooden plug are installed according to a construction drawing; concrete pouring and curing work is conducted in the installed formwork, a first section of well wall is formed, and soil backfilling and tamping are conducted on the periphery of the first section of well wall; the first section of well wall is excavated to sink, measurement and deviation rectification are conducted in time, and the next section of well wall is manufactured; earth is excavated to sink the open caisson to the designed elevation, open caisson bottom sealing and top plate construction are carried out to form a complete open caisson, and the remaining well wall and a middle-layer plate are backfilled; the construction period of the open caisson is shortened, and manual labor is saved.
本发明提供预留孔洞沉井施工工法,包括:对施工区域进行测量,开挖基底并整平基底,进行砂、素砼垫层工作;按照施工图纸在铺好砂、素砼垫层的基底上进行第一节钢筋绑扎工作;制作木质封堵塞,向木质封堵塞灌注水泥砂浆,按照施工图纸安装模板和木质封堵塞;向安装好的模板内进行混凝土浇筑养护工作,形成第一节井壁,对第一节井壁四周进行回填土并夯实;对第一节井壁挖土下沉并及时进行测量纠偏工作,进行下一节井壁制作;挖土下沉沉井到达设计高程,进行沉井封底与顶板施工形成完整沉井,对剩余井壁、中层板进行回填工作;本发明缩短了沉井施工工期,节省了人力劳动。
Hole-reserved open caisson construction method
预留孔洞沉井施工工法
ZHAO YUKUO (author) / GAO CHAO (author) / ZHU XIJING (author) / LIU JIN (author) / MA JIANJUN (author) / LIU LEI (author) / GAO YANDA (author) / LI KUN (author) / LU TONGWEI (author) / LI YULIANG (author)
2024-03-26
Patent
Electronic Resource
Chinese
Open caisson reserved hole device and construction method
European Patent Office | 2023
|Temporary supporting device for reserved hole of open caisson
European Patent Office | 2022
|Plugging device for large open caisson cantilever I-steel reserved hole
European Patent Office | 2023
|European Patent Office | 2023
|Construction method and device for blocking reserved relief well of open caisson
European Patent Office | 2023
|