A platform for research: civil engineering, architecture and urbanism
Height-adjustable anti-settlement foundation pile of electric power iron tower
The height-adjustable anti-sedimentation foundation pile comprises an electric tower body, the bottom of the electric tower body is provided with a foundation pile body, the outer wall of the foundation pile body is fixedly provided with a buried line, the top surface of the foundation pile body is provided with a positioning plate, a screw is arranged in the positioning plate, the outer wall of the screw is sleeved with a nut, and the nut is fixedly connected with the foundation pile body. The machining assembly is arranged on the top face of the foundation pile body and comprises a synchronous assembly arranged on the top face of the foundation pile body, an adjusting assembly is arranged on the top face of the synchronous assembly, an anti-disengaging assembly is arranged above the adjusting assembly, and the synchronous assembly forms a component. Firstly, the positioning plate on one side of the electric tower body is lowered, the wrench is clamped to the outer wall of the rotary disc, under the limitation of the limiting rings arranged on the two sides of the rotary disc, the wrench and the rotary disc can be prevented from falling off, and at the moment, the rotary disc is rotated to drive the rotary rod to rotate.
本发明公开了一种电力铁塔的可调高防沉降基础桩,包括电塔本体,所述电塔本体底部设置有基础桩本体,所述基础桩本体外壁固定安装有埋深线,所述基础桩本体顶面设置有定位板,所述定位板内部设置有螺杆,所述螺杆外壁套设有螺母,以及设置在基础桩本体顶面的加工组件,所述加工组件包括设置在基础桩本体顶面的同步组件,所述同步组件顶面设置有调节组件,所述调节组件上方设置有防脱组件,由同步组件构成其一部件,当电塔本体发生偏斜时,需要对其进行矫正,首先调低电塔本体的一侧的定位板,此时将扳手与转盘外壁卡接,在转盘两侧设置的限位环限制下,可以避免扳手与转盘脱落,此时转动转盘,使得转盘带动转杆转动。
Height-adjustable anti-settlement foundation pile of electric power iron tower
The height-adjustable anti-sedimentation foundation pile comprises an electric tower body, the bottom of the electric tower body is provided with a foundation pile body, the outer wall of the foundation pile body is fixedly provided with a buried line, the top surface of the foundation pile body is provided with a positioning plate, a screw is arranged in the positioning plate, the outer wall of the screw is sleeved with a nut, and the nut is fixedly connected with the foundation pile body. The machining assembly is arranged on the top face of the foundation pile body and comprises a synchronous assembly arranged on the top face of the foundation pile body, an adjusting assembly is arranged on the top face of the synchronous assembly, an anti-disengaging assembly is arranged above the adjusting assembly, and the synchronous assembly forms a component. Firstly, the positioning plate on one side of the electric tower body is lowered, the wrench is clamped to the outer wall of the rotary disc, under the limitation of the limiting rings arranged on the two sides of the rotary disc, the wrench and the rotary disc can be prevented from falling off, and at the moment, the rotary disc is rotated to drive the rotary rod to rotate.
本发明公开了一种电力铁塔的可调高防沉降基础桩,包括电塔本体,所述电塔本体底部设置有基础桩本体,所述基础桩本体外壁固定安装有埋深线,所述基础桩本体顶面设置有定位板,所述定位板内部设置有螺杆,所述螺杆外壁套设有螺母,以及设置在基础桩本体顶面的加工组件,所述加工组件包括设置在基础桩本体顶面的同步组件,所述同步组件顶面设置有调节组件,所述调节组件上方设置有防脱组件,由同步组件构成其一部件,当电塔本体发生偏斜时,需要对其进行矫正,首先调低电塔本体的一侧的定位板,此时将扳手与转盘外壁卡接,在转盘两侧设置的限位环限制下,可以避免扳手与转盘脱落,此时转动转盘,使得转盘带动转杆转动。
Height-adjustable anti-settlement foundation pile of electric power iron tower
一种电力铁塔的可调高防沉降基础桩
ZHAO KAI (author) / YANG DEZHOU (author) / WANG PING (author) / ZHANG XINGXING (author) / ZHU LIQING (author)
2024-03-26
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Height-adjustable anti-settlement foundation pile of electric power iron tower
European Patent Office | 2023
|Novel power transmission line iron tower pile foundation
European Patent Office | 2024
|