Construction method of super high-rise high-altitude large-span cantilever concrete structure
A construction method of a super high-rise high-altitude large-span cantilever concrete structure comprises the following steps that firstly, the structure of the cantilever concrete structure is optimized, and a construction drawing is designed; 2, deeply designing measure supports, wherein the measure supports comprise supporting frames and hanging baskets; thirdly, a main body is constructed in advance; fourthly, the prefabricated concrete beam sections are prefabricated on site; step 5, manufacturing and mounting a support frame; sixthly, prefabricated concrete beam sections are hoisted; seventhly, a cast-in-place concrete section is constructed; eighthly, an upper pull rod and a lower supporting rod are installed; and ninthly, the hanging basket, the hanging platform and the supporting frame are sequentially dismantled. The technical problems that a large-span cantilever structure is complex in construction technology, long in construction period and large in construction danger are solved.
一种超高层高空大跨度悬挑混凝土结构的施工方法,包括步骤如下:步骤一,悬挑混凝土结构的结构优化及施工图设计;步骤二,措施支撑的深化设计,措施支撑包括有支撑架和吊篮;步骤三,主体先行施工;步骤四,预制混凝土梁段现场预制;步骤五,支撑架的制作与安装;步骤六:预制混凝土梁段的吊装;步骤七:现浇混凝土段的施工;步骤八:上拉杆和下撑杆的安装;步骤九:依次拆除吊篮、吊挂平台和支撑架。本发明解决了大跨度悬挑结构施工工艺复杂、施工工期长以及施工危险性大的技术问题。
Construction method of super high-rise high-altitude large-span cantilever concrete structure
A construction method of a super high-rise high-altitude large-span cantilever concrete structure comprises the following steps that firstly, the structure of the cantilever concrete structure is optimized, and a construction drawing is designed; 2, deeply designing measure supports, wherein the measure supports comprise supporting frames and hanging baskets; thirdly, a main body is constructed in advance; fourthly, the prefabricated concrete beam sections are prefabricated on site; step 5, manufacturing and mounting a support frame; sixthly, prefabricated concrete beam sections are hoisted; seventhly, a cast-in-place concrete section is constructed; eighthly, an upper pull rod and a lower supporting rod are installed; and ninthly, the hanging basket, the hanging platform and the supporting frame are sequentially dismantled. The technical problems that a large-span cantilever structure is complex in construction technology, long in construction period and large in construction danger are solved.
一种超高层高空大跨度悬挑混凝土结构的施工方法,包括步骤如下:步骤一,悬挑混凝土结构的结构优化及施工图设计;步骤二,措施支撑的深化设计,措施支撑包括有支撑架和吊篮;步骤三,主体先行施工;步骤四,预制混凝土梁段现场预制;步骤五,支撑架的制作与安装;步骤六:预制混凝土梁段的吊装;步骤七:现浇混凝土段的施工;步骤八:上拉杆和下撑杆的安装;步骤九:依次拆除吊篮、吊挂平台和支撑架。本发明解决了大跨度悬挑结构施工工艺复杂、施工工期长以及施工危险性大的技术问题。
Construction method of super high-rise high-altitude large-span cantilever concrete structure
一种超高层高空大跨度悬挑混凝土结构的施工方法
SUN WANLI (author) / LIN TIANYU (author) / LI WEI (author) / WANG PENG (author) / WU WENQIAN (author) / LIANG XUXUAN (author) / MEI JINBO (author) / ZHANG HUI (author) / MU DAN (author) / ZHANG WENYU (author)
2024-03-26
Patent
Electronic Resource
Chinese
Construction method of high-rise large-span cantilever structure
European Patent Office | 2023
|High-altitude large-span cantilever inclined eave construction device
European Patent Office | 2023
|Super high-rise building large-span cantilever platform and hoisting construction method thereof
European Patent Office | 2023
|Large-span concrete construction cantilever formwork structure
European Patent Office | 2021
|