Soil digging amount calculation method for inclination rectification of independent foundation frame structure
The invention relates to the field of buildings, and provides a soil digging amount calculation method for inclination rectification of an independent foundation frame structure, which is characterized by comprising the following steps of: S1, determining a to-be-settled amount of a position below each independent central point; s2, determining the settlement promoting volume of the foundation; and S3, calculating the volume of the dug soil under the foundation. The method has the beneficial effects that an accurate soil digging design construction method is provided for soil digging and inclination rectification of the independent foundation under the frame column; furthermore, an empirical coefficient is given, and the building horizontal soil digging and inclination rectifying level is improved to the accurate calculation and construction guidance level according to experience and monitoring implementation; through accurate calculation, excessive soil digging and multiple times of soil digging can be avoided, the construction period is greatly shortened, and the rectification cost is reduced.
本发明涉及建筑领域,提供一种独立基础框架结构纠倾的掏土量计算方法,其特征在于,包括以下步骤:S1:确定各独立中心点下位置的拟促沉量;S2:确定基础促沉量体积;S3:计算基础下掏土体积。本发明的有益效果在于:针对框架柱下独立基础掏土纠倾,提出精确掏土设计施工方法;更进一步地给出经验系数,将建筑物水平掏土纠倾依经验和监测实施提升到精确计算指导施工水平;通过精确计算,可以避免过度掏土和多遍掏土,大幅度缩短工期和降低纠倾成本。
Soil digging amount calculation method for inclination rectification of independent foundation frame structure
The invention relates to the field of buildings, and provides a soil digging amount calculation method for inclination rectification of an independent foundation frame structure, which is characterized by comprising the following steps of: S1, determining a to-be-settled amount of a position below each independent central point; s2, determining the settlement promoting volume of the foundation; and S3, calculating the volume of the dug soil under the foundation. The method has the beneficial effects that an accurate soil digging design construction method is provided for soil digging and inclination rectification of the independent foundation under the frame column; furthermore, an empirical coefficient is given, and the building horizontal soil digging and inclination rectifying level is improved to the accurate calculation and construction guidance level according to experience and monitoring implementation; through accurate calculation, excessive soil digging and multiple times of soil digging can be avoided, the construction period is greatly shortened, and the rectification cost is reduced.
本发明涉及建筑领域,提供一种独立基础框架结构纠倾的掏土量计算方法,其特征在于,包括以下步骤:S1:确定各独立中心点下位置的拟促沉量;S2:确定基础促沉量体积;S3:计算基础下掏土体积。本发明的有益效果在于:针对框架柱下独立基础掏土纠倾,提出精确掏土设计施工方法;更进一步地给出经验系数,将建筑物水平掏土纠倾依经验和监测实施提升到精确计算指导施工水平;通过精确计算,可以避免过度掏土和多遍掏土,大幅度缩短工期和降低纠倾成本。
Soil digging amount calculation method for inclination rectification of independent foundation frame structure
一种独立基础框架结构纠倾的掏土量计算方法
XIAO JUNHUA (author) / KONG LINGYANG (author) / GAO XIANG (author) / SUN JIANPING (author) / YAN KAI (author)
2024-03-26
Patent
Electronic Resource
Chinese
Soft soil slope pile foundation inclination rectification structure and construction method
European Patent Office | 2024
|Bidirectional stress relief and inclination rectification method for piled raft foundation
European Patent Office | 2024
|Frame structure building pile foundation support inclination correcting method
European Patent Office | 2021
|FRAME STRUCTURE BUILDING RECTIFICATION METHOD USING PILE FOUNDATION SUPPORT
European Patent Office | 2022
|METHOD FOR INCLINATION RECTIFICATION BY ROTATIONAL DISPLACEMENT OF BUILDING UNDERPINNING FOUNDATION
European Patent Office | 2022
|