A platform for research: civil engineering, architecture and urbanism
Steel sheet pile and high-pressure jet grouting pile combined supporting structure and construction method
The invention discloses a combined supporting structure of steel sheet piles and high-pressure jet grouting piles and a construction method, the steel sheet piles are arranged outside a foundation pit, the high-pressure jet grouting piles comprise first high-pressure jet grouting piles and second high-pressure jet grouting piles, the first high-pressure jet grouting piles are arranged outside the steel sheet piles, and the second high-pressure jet grouting piles are arranged between the first high-pressure jet grouting piles and the steel sheet piles; the construction method comprises the following steps that S1, the surrounding environment is investigated; s2, on-site lofting, stay wire fixing; s3, high-pressure jet grouting pile construction; s4, guiding a hole by a long spiral drilling machine; s5, steel sheet pile construction; s6, the high-pressure jet grouting piles are subjected to re-grouting; and S7, the foundation pit is excavated. According to the combined supporting structure of the steel sheet piles and the high-pressure jet grouting piles and the construction method, the construction period is short, and disturbance to surrounding buildings and road surfaces is small.
本发明公开了一种钢板桩与高压旋喷桩的组合支护结构及施工方法,钢板桩设在基坑外部,高压旋喷桩包括第一高压旋喷桩和第二高压旋喷桩,第一高压旋喷桩设在钢板桩外部,第二高压旋喷桩设在第一高压旋喷桩与钢板桩之间;施工方法包括以下步骤:S1、调查周边环境;S2、现场放样拉线定点;S3、高压旋喷桩施工;S4、长螺旋钻机引孔;S5、钢板桩施工;S6、高压旋喷桩进行复喷;S7、基坑开挖。采用本发明的钢板桩与高压旋喷桩的组合支护结构及施工方法,施工周期短、对周边建筑物和路面扰动小。
Steel sheet pile and high-pressure jet grouting pile combined supporting structure and construction method
The invention discloses a combined supporting structure of steel sheet piles and high-pressure jet grouting piles and a construction method, the steel sheet piles are arranged outside a foundation pit, the high-pressure jet grouting piles comprise first high-pressure jet grouting piles and second high-pressure jet grouting piles, the first high-pressure jet grouting piles are arranged outside the steel sheet piles, and the second high-pressure jet grouting piles are arranged between the first high-pressure jet grouting piles and the steel sheet piles; the construction method comprises the following steps that S1, the surrounding environment is investigated; s2, on-site lofting, stay wire fixing; s3, high-pressure jet grouting pile construction; s4, guiding a hole by a long spiral drilling machine; s5, steel sheet pile construction; s6, the high-pressure jet grouting piles are subjected to re-grouting; and S7, the foundation pit is excavated. According to the combined supporting structure of the steel sheet piles and the high-pressure jet grouting piles and the construction method, the construction period is short, and disturbance to surrounding buildings and road surfaces is small.
本发明公开了一种钢板桩与高压旋喷桩的组合支护结构及施工方法,钢板桩设在基坑外部,高压旋喷桩包括第一高压旋喷桩和第二高压旋喷桩,第一高压旋喷桩设在钢板桩外部,第二高压旋喷桩设在第一高压旋喷桩与钢板桩之间;施工方法包括以下步骤:S1、调查周边环境;S2、现场放样拉线定点;S3、高压旋喷桩施工;S4、长螺旋钻机引孔;S5、钢板桩施工;S6、高压旋喷桩进行复喷;S7、基坑开挖。采用本发明的钢板桩与高压旋喷桩的组合支护结构及施工方法,施工周期短、对周边建筑物和路面扰动小。
Steel sheet pile and high-pressure jet grouting pile combined supporting structure and construction method
一种钢板桩与高压旋喷桩的组合支护结构及施工方法
YANG XIAOJUN (author) / ZHANG ZHIHUA (author) / YIN CHEN (author) / TAN XIAOFENG (author) / GAO LEI (author) / QIN WEI (author) / LIU WEN (author) / YANG HAO (author) / LIN BINGCHENG (author) / LIN SHUO (author)
2024-03-29
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Larsen steel sheet pile and high-pressure jet grouting pile combined cofferdam construction method
European Patent Office | 2021
|European Patent Office | 2024
|Steel sheet pile and cement mixing pile combined supporting structure and construction method
European Patent Office | 2024
|European Patent Office | 2021
|European Patent Office | 2015
|