A platform for research: civil engineering, architecture and urbanism
Temporary fixing structure and temporary fixing method for steel pipe column
The invention discloses a steel pipe column temporary fixing structure and a temporary fixing method thereof.The temporary fixing structure comprises a horizontal supporting piece used for being supported at the top end of a cup mouth bearing platform, and the horizontal supporting piece is detachably connected to the periphery of a steel pipe column; the connecting position of the horizontal supporting piece meets the condition that the bottom elevation of the steel pipe column is equal to the bottom design elevation in the state that the horizontal supporting piece is supported at the top end of the cup mouth bearing platform. The inserting rod is vertically connected to the bottom of the horizontal supporting piece; and the inserting hole is used for inserting the inserting rod, the inserting hole is formed in the top end of the cup mouth bearing platform, and by arranging the temporary fixing structure, the construction efficiency is improved.
本发明公开了一种钢管柱临时固定结构及其临时固定方法,所述临时固定结构包括:用于支撑在杯口承台的顶端的水平支撑件,所述水平支撑件可拆卸地连接在钢管柱的外周,所述水平支撑件的连接位置满足在所述水平支撑件支撑在所述杯口承台的顶端的状态下,所述钢管柱的底部标高等于底部设计标高;竖向连接在所述水平支撑件底部的插杆;供所述插杆插设的插孔,所述插孔开设在所述杯口承台的顶端,通过设置所述临时固定结构,提高了施工效率。
Temporary fixing structure and temporary fixing method for steel pipe column
The invention discloses a steel pipe column temporary fixing structure and a temporary fixing method thereof.The temporary fixing structure comprises a horizontal supporting piece used for being supported at the top end of a cup mouth bearing platform, and the horizontal supporting piece is detachably connected to the periphery of a steel pipe column; the connecting position of the horizontal supporting piece meets the condition that the bottom elevation of the steel pipe column is equal to the bottom design elevation in the state that the horizontal supporting piece is supported at the top end of the cup mouth bearing platform. The inserting rod is vertically connected to the bottom of the horizontal supporting piece; and the inserting hole is used for inserting the inserting rod, the inserting hole is formed in the top end of the cup mouth bearing platform, and by arranging the temporary fixing structure, the construction efficiency is improved.
本发明公开了一种钢管柱临时固定结构及其临时固定方法,所述临时固定结构包括:用于支撑在杯口承台的顶端的水平支撑件,所述水平支撑件可拆卸地连接在钢管柱的外周,所述水平支撑件的连接位置满足在所述水平支撑件支撑在所述杯口承台的顶端的状态下,所述钢管柱的底部标高等于底部设计标高;竖向连接在所述水平支撑件底部的插杆;供所述插杆插设的插孔,所述插孔开设在所述杯口承台的顶端,通过设置所述临时固定结构,提高了施工效率。
Temporary fixing structure and temporary fixing method for steel pipe column
钢管柱临时固定结构及其临时固定方法
GAO CHAO (author) / WANG XIAOWEI (author) / WANG BIN (author) / YU KEXIAN (author)
2024-03-29
Patent
Electronic Resource
Chinese
Temporary steel column fixing method in slippage construction process
European Patent Office | 2024
|European Patent Office | 2024
|