Guardrail base transforming and lifting construction method
The invention relates to a construction method for reconstruction and lifting of a guardrail base. The construction method comprises the following steps that S1, drilling is conducted on the surface of an original base according to design requirements; s2, after drilling is completed, concrete on the surface of the original base is chiseled away, and the chiseled-away face and the drilled hole are cleaned; s3, reinforcing ribs are bound, and the bound reinforcing ribs are connected with the reinforcing ribs in the original base; supporting the template; a forming pipe is installed at the drill hole, and the drill hole is blocked; s4, concrete is poured; anchor bolts are installed; and finally, a flange plate is installed, and transformation and lifting construction of the guardrail base is completed. The construction method has the effects of improving the working efficiency and shortening the construction period.
本申请涉及一种护栏基座改造提升施工方法,施工方法包括以下步骤:S1:根据设计要求在原基座表面进行钻孔;S2:钻孔完成后凿除原基座表面的混凝土,并对凿除面以及钻孔进行清理;S3:绑扎加固筋,并将绑扎的加固筋与原基座内的加固筋进行接植;模板支护;在钻孔处安装成型管,对钻孔形成堵塞;S4:浇筑混凝土;安装锚栓;最后安装法兰盘,即完成对护栏基座的改造提升施工。本申请具有提高工作效率,缩短施工周期的效果。
Guardrail base transforming and lifting construction method
The invention relates to a construction method for reconstruction and lifting of a guardrail base. The construction method comprises the following steps that S1, drilling is conducted on the surface of an original base according to design requirements; s2, after drilling is completed, concrete on the surface of the original base is chiseled away, and the chiseled-away face and the drilled hole are cleaned; s3, reinforcing ribs are bound, and the bound reinforcing ribs are connected with the reinforcing ribs in the original base; supporting the template; a forming pipe is installed at the drill hole, and the drill hole is blocked; s4, concrete is poured; anchor bolts are installed; and finally, a flange plate is installed, and transformation and lifting construction of the guardrail base is completed. The construction method has the effects of improving the working efficiency and shortening the construction period.
本申请涉及一种护栏基座改造提升施工方法,施工方法包括以下步骤:S1:根据设计要求在原基座表面进行钻孔;S2:钻孔完成后凿除原基座表面的混凝土,并对凿除面以及钻孔进行清理;S3:绑扎加固筋,并将绑扎的加固筋与原基座内的加固筋进行接植;模板支护;在钻孔处安装成型管,对钻孔形成堵塞;S4:浇筑混凝土;安装锚栓;最后安装法兰盘,即完成对护栏基座的改造提升施工。本申请具有提高工作效率,缩短施工周期的效果。
Guardrail base transforming and lifting construction method
一种护栏基座改造提升施工方法
WANG HAIPING (author) / ZHANG QING (author) / YANG JIANFENG (author) / ZHANG XIONG (author) / LIANG TIANHAN (author)
2024-04-09
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Wave-shaped beam guardrail lifting and transforming structure
European Patent Office | 2024
|Bolting prefabricated and assembled bridge guardrail lifting and transforming structure
European Patent Office | 2024
|Lifting and transforming device and method based on existing concrete anti-collision guardrail
European Patent Office | 2022
|