Hanging basket structure for installing glass handrail of landscape bridge and construction method
The invention discloses a hanging basket structure for landscape bridge glass handrail installation and a construction method. The hanging basket structure comprises a moving assembly. One side of the moving assembly is connected with an operation basket assembly; the moving assembly comprises a bottom small cross rod; the number of the bottom small cross rods is four. The bottom small cross rod is connected with a movable assembly tee joint; the bottom small cross rod is connected with a moving assembly stand column through a moving assembly tee joint. The moving assembly stand column is connected with a moving assembly upper four-way joint. Two short-direction horizontal cross rods and two cross beams are connected to the moving assembly stand columns through moving assembly upper four-way joints; the lower end of the moving assembly is connected with four bottom universal wheels. The device is easy to operate, waste of resources such as people, materials and machines is reduced, convenience and quality of installation of the landscape bridge glass guardrail are guaranteed, and meanwhile safety of operators is guaranteed.
本发明公开了一种用于景观桥玻璃栏杆安装吊篮结构及施工方法,包括移动组件;所述移动组件一侧连接有操作篮组件;所述移动组件包括底部小横杆;所述底部小横杆设有四根;且所述底部小横杆上连接有移动组件三通;所述底部小横杆上通过移动组件三通连接有移动组件立柱;所述移动组件立柱上连接有移动组件上部四通;所述移动组件立柱上通过移动组件上部四通连接有两个短向水平横杆和两个横梁;所述移动组件下端连接有四个底部万向轮。本发明操作简单,减少人材机等资源的浪费,保证了景观桥玻璃护栏安装的便利又保障了安装的质量,同时保障了操作人员的安全。
Hanging basket structure for installing glass handrail of landscape bridge and construction method
The invention discloses a hanging basket structure for landscape bridge glass handrail installation and a construction method. The hanging basket structure comprises a moving assembly. One side of the moving assembly is connected with an operation basket assembly; the moving assembly comprises a bottom small cross rod; the number of the bottom small cross rods is four. The bottom small cross rod is connected with a movable assembly tee joint; the bottom small cross rod is connected with a moving assembly stand column through a moving assembly tee joint. The moving assembly stand column is connected with a moving assembly upper four-way joint. Two short-direction horizontal cross rods and two cross beams are connected to the moving assembly stand columns through moving assembly upper four-way joints; the lower end of the moving assembly is connected with four bottom universal wheels. The device is easy to operate, waste of resources such as people, materials and machines is reduced, convenience and quality of installation of the landscape bridge glass guardrail are guaranteed, and meanwhile safety of operators is guaranteed.
本发明公开了一种用于景观桥玻璃栏杆安装吊篮结构及施工方法,包括移动组件;所述移动组件一侧连接有操作篮组件;所述移动组件包括底部小横杆;所述底部小横杆设有四根;且所述底部小横杆上连接有移动组件三通;所述底部小横杆上通过移动组件三通连接有移动组件立柱;所述移动组件立柱上连接有移动组件上部四通;所述移动组件立柱上通过移动组件上部四通连接有两个短向水平横杆和两个横梁;所述移动组件下端连接有四个底部万向轮。本发明操作简单,减少人材机等资源的浪费,保证了景观桥玻璃护栏安装的便利又保障了安装的质量,同时保障了操作人员的安全。
Hanging basket structure for installing glass handrail of landscape bridge and construction method
一种用于景观桥玻璃栏杆安装吊篮结构及施工方法
BI SHENGLI (author) / GAO DAWEI (author) / YUAN BENFENG (author) / ZHANG JIANFENG (author)
2024-04-12
Patent
Electronic Resource
Chinese