A platform for research: civil engineering, architecture and urbanism
Rock-fill concrete pouring device under vacuum condition and construction method thereof
The invention relates to a rock-fill concrete pouring device under a vacuum condition and a construction method thereof, and belongs to the technical field of water conservancy projects. The method comprises the steps that firstly, a site is leveled, a steel mold is erected to form a rockfill concrete pouring bin, a steel barrel is placed in the pouring bin, rockfill is stacked in the steel barrel, after the steel barrel is filled with the rockfill, the rockfill is leveled, then a top steel cover plate covers the steel barrel, and the top steel cover plate is tightly connected with the steel barrel; after the vacuum degree in the rock-fill concrete pouring bin meets the requirement, the grouting valve of the grouting pipe on the top steel cover plate is opened, self-compacting concrete is poured into the rockfill, the vacuum pump is still opened while grouting is conducted, grouting and air exhausting are conducted at the same time, and rock-fill concrete pouring under the vacuum condition is achieved. The defect that large gaps are easily formed in the traditional rock-fill concrete pouring process is overcome, the gaps are greatly reduced, the compactness of the rock-fill concrete is improved, and the mechanical property of the rock-fill concrete is improved.
本发明涉及一种真空条件下的堆石混凝土浇筑装置及其施工方法,属于水利工程技术领域。本发明首先平整场地,竖立钢模形成堆石混凝土浇筑仓,在浇筑仓内部放置钢桶,在钢桶内堆填堆石,当堆石堆填满后,对堆石进行整平,再盖顶部钢盖板,顶部钢盖板与钢桶的之间紧密连接;然后利用排气管进行抽气,当堆石混凝土浇筑仓内的真空度达到要求后,打开顶部钢盖板上的注浆管的注浆阀门向堆石中灌注自密实混凝土,注浆的同时仍打开真空泵,边注浆、边抽气,实现真空条件下的堆石混凝土浇筑。本发明克服传统堆石混凝土浇筑过程中易形成大空隙的不足,极大限度减小空隙的存在,提高堆石混凝土的密实性,改善堆石混凝土的力学性能。
Rock-fill concrete pouring device under vacuum condition and construction method thereof
The invention relates to a rock-fill concrete pouring device under a vacuum condition and a construction method thereof, and belongs to the technical field of water conservancy projects. The method comprises the steps that firstly, a site is leveled, a steel mold is erected to form a rockfill concrete pouring bin, a steel barrel is placed in the pouring bin, rockfill is stacked in the steel barrel, after the steel barrel is filled with the rockfill, the rockfill is leveled, then a top steel cover plate covers the steel barrel, and the top steel cover plate is tightly connected with the steel barrel; after the vacuum degree in the rock-fill concrete pouring bin meets the requirement, the grouting valve of the grouting pipe on the top steel cover plate is opened, self-compacting concrete is poured into the rockfill, the vacuum pump is still opened while grouting is conducted, grouting and air exhausting are conducted at the same time, and rock-fill concrete pouring under the vacuum condition is achieved. The defect that large gaps are easily formed in the traditional rock-fill concrete pouring process is overcome, the gaps are greatly reduced, the compactness of the rock-fill concrete is improved, and the mechanical property of the rock-fill concrete is improved.
本发明涉及一种真空条件下的堆石混凝土浇筑装置及其施工方法,属于水利工程技术领域。本发明首先平整场地,竖立钢模形成堆石混凝土浇筑仓,在浇筑仓内部放置钢桶,在钢桶内堆填堆石,当堆石堆填满后,对堆石进行整平,再盖顶部钢盖板,顶部钢盖板与钢桶的之间紧密连接;然后利用排气管进行抽气,当堆石混凝土浇筑仓内的真空度达到要求后,打开顶部钢盖板上的注浆管的注浆阀门向堆石中灌注自密实混凝土,注浆的同时仍打开真空泵,边注浆、边抽气,实现真空条件下的堆石混凝土浇筑。本发明克服传统堆石混凝土浇筑过程中易形成大空隙的不足,极大限度减小空隙的存在,提高堆石混凝土的密实性,改善堆石混凝土的力学性能。
Rock-fill concrete pouring device under vacuum condition and construction method thereof
一种真空条件下的堆石混凝土浇筑装置及其施工方法
WEI HAI (author) / TANG BAOHENG (author) / HE ZHIYUAN (author) / ZHENG CHENGMING (author) / LI RUI (author) / TAO KAIYUN (author) / ZHANG ZHIXIONG (author) / YANG SHENGYOU (author) / LUO YONGQIN (author) / LEI HONGJUN (author)
2024-04-12
Patent
Electronic Resource
Chinese
Construction method for pouring rock-fill concrete dam body
European Patent Office | 2023
|Active anti-freezing concrete panel for rock-fill dam and pouring method
European Patent Office | 2023
|Rock-fill concrete permeable dam and construction method thereof
European Patent Office | 2022
|