Water leakage maintenance method for point switch pit structure
According to the water leakage maintenance method for the point machine pit structure, a water channeling layer and the bottom of a foundation pit can be comprehensively blocked, the construction period is short, and the influence on normal operation of a locomotive is small. The method comprises the following steps: (1) grouting, filling and tamping a void layer: drilling a grouting hole, penetrating through a ballast bed layer to the void layer, burying a grouting pipe, preparing slurry, then grouting, removing the grouting pipe, and blocking the grouting hole; and (2) filling and bonding a gap between the ballast bed structure and the base structure: drilling a grouting hole, penetrating through the ballast bed layer to a void layer, embedding a grouting needle, preparing slurry, filling, removing the grouting needle, and blocking the grouting hole.
一种转辙机坑结构的渗漏水维修方法,其能够全面封堵窜水层和基坑底部,并且施工周期短,对机车的正常运行影响小。其包括以下步骤:(1)对脱空层灌浆、填充、夯实:钻注浆孔,穿透道床层至脱空层,埋设注浆管,配制浆液后灌注,然后撤除注浆管,封堵注浆孔眼;(2)对道床结构和基底结构之间的间隙进行灌注粘接:钻注浆孔,穿透道床层至脱空层,埋设注浆针头,配制浆液后灌注,然后撤除注浆针头,封堵注浆孔眼。
Water leakage maintenance method for point switch pit structure
According to the water leakage maintenance method for the point machine pit structure, a water channeling layer and the bottom of a foundation pit can be comprehensively blocked, the construction period is short, and the influence on normal operation of a locomotive is small. The method comprises the following steps: (1) grouting, filling and tamping a void layer: drilling a grouting hole, penetrating through a ballast bed layer to the void layer, burying a grouting pipe, preparing slurry, then grouting, removing the grouting pipe, and blocking the grouting hole; and (2) filling and bonding a gap between the ballast bed structure and the base structure: drilling a grouting hole, penetrating through the ballast bed layer to a void layer, embedding a grouting needle, preparing slurry, filling, removing the grouting needle, and blocking the grouting hole.
一种转辙机坑结构的渗漏水维修方法,其能够全面封堵窜水层和基坑底部,并且施工周期短,对机车的正常运行影响小。其包括以下步骤:(1)对脱空层灌浆、填充、夯实:钻注浆孔,穿透道床层至脱空层,埋设注浆管,配制浆液后灌注,然后撤除注浆管,封堵注浆孔眼;(2)对道床结构和基底结构之间的间隙进行灌注粘接:钻注浆孔,穿透道床层至脱空层,埋设注浆针头,配制浆液后灌注,然后撤除注浆针头,封堵注浆孔眼。
Water leakage maintenance method for point switch pit structure
转辙机坑结构的渗漏水维修方法
XUE FENG (author) / GONG DENGWEI (author) / ZHANG LI (author) / GONG DENGZHEN (author) / XUE HONGLIN (author) / XUE JIN (author) / XUE BING (author) / XUE XIAOBING (author) / LI ZENGHUI (author) / LIU ZHIYONG (author)
2024-04-16
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Water leakage maintenance process for building structure
European Patent Office | 2024
|Concrete structure leakage point detection device and leakage point processing method
European Patent Office | 2024
|Return water beam leakage maintenance construction method
European Patent Office | 2021
|Fixed roof leakage maintenance device and roof leakage maintenance method
European Patent Office | 2022
|