A platform for research: civil engineering, architecture and urbanism
Equipment and method for tamping side slope roadbed
The invention relates to equipment and method for tamping a side slope roadbed, and relates to the field of side slope construction, and the equipment for tamping the side slope roadbed comprises a supporting structure, a driving assembly and a tamping assembly; the tamping assembly comprises a main tamping seat, an auxiliary tamping seat and a first elastic piece; the main tamping seat is connected to the driving assembly; the auxiliary rammer base is connected to the periphery of the main rammer base in a sleeving mode, and the auxiliary rammer base is connected to the main rammer base in a sliding mode in the driving direction of the driving assembly; the first elastic piece is connected between the main tamping seat and the auxiliary tamping seat; when the first elastic piece is in a normal state, the tamping face of the main tamping base is located on the side, away from the driving assembly, of the tamping face of the auxiliary tamping base. The tamping method comprises the following steps that S1, the tamping equipment is moved to the side of the side slope; and S2, the driving assembly drives the tamping assembly to move towards the side slope so as to tamp the side slope. The compaction device has the effect of reducing soil collapse in the compaction process.
本申请涉及一种用于夯实边坡路基的设备及方法,涉及边坡施工的领域,用于夯实边坡路基的设备包括支撑结构、驱动组件和夯实组件;所述夯实组件包括主夯座、辅助夯座和第一弹性件;所述主夯座连接于所述驱动组件;所述辅助夯座套接于所述主夯座外周,所述辅助夯座沿所述驱动组件的驱动方向滑动连接于主夯座;所述第一弹性件连接于所述主夯座和所述辅助夯座之间;所述第一弹性件在常态下,所述主夯座的夯实面位于所述辅助夯座的夯实面远离所述驱动组件的一侧;夯实方法包括如下步骤:S1:移动夯实设备至边坡侧方;S2:由驱动组件驱动夯实组件向边坡移动,以对边坡夯实。本申请具有减少夯实过程中土壤坍落的效果。
Equipment and method for tamping side slope roadbed
The invention relates to equipment and method for tamping a side slope roadbed, and relates to the field of side slope construction, and the equipment for tamping the side slope roadbed comprises a supporting structure, a driving assembly and a tamping assembly; the tamping assembly comprises a main tamping seat, an auxiliary tamping seat and a first elastic piece; the main tamping seat is connected to the driving assembly; the auxiliary rammer base is connected to the periphery of the main rammer base in a sleeving mode, and the auxiliary rammer base is connected to the main rammer base in a sliding mode in the driving direction of the driving assembly; the first elastic piece is connected between the main tamping seat and the auxiliary tamping seat; when the first elastic piece is in a normal state, the tamping face of the main tamping base is located on the side, away from the driving assembly, of the tamping face of the auxiliary tamping base. The tamping method comprises the following steps that S1, the tamping equipment is moved to the side of the side slope; and S2, the driving assembly drives the tamping assembly to move towards the side slope so as to tamp the side slope. The compaction device has the effect of reducing soil collapse in the compaction process.
本申请涉及一种用于夯实边坡路基的设备及方法,涉及边坡施工的领域,用于夯实边坡路基的设备包括支撑结构、驱动组件和夯实组件;所述夯实组件包括主夯座、辅助夯座和第一弹性件;所述主夯座连接于所述驱动组件;所述辅助夯座套接于所述主夯座外周,所述辅助夯座沿所述驱动组件的驱动方向滑动连接于主夯座;所述第一弹性件连接于所述主夯座和所述辅助夯座之间;所述第一弹性件在常态下,所述主夯座的夯实面位于所述辅助夯座的夯实面远离所述驱动组件的一侧;夯实方法包括如下步骤:S1:移动夯实设备至边坡侧方;S2:由驱动组件驱动夯实组件向边坡移动,以对边坡夯实。本申请具有减少夯实过程中土壤坍落的效果。
Equipment and method for tamping side slope roadbed
一种用于夯实边坡路基的设备及方法
LIU JINGSHENG (author) / FENG PEIJIAN (author) / ZHANG WEI (author) / LI YUHONG (author) / SONG ZENGGUO (author) / LEI TENG (author) / LIU MENGQIANG (author) / ZHANG KE (author) / HE DUODUO (author)
2024-04-19
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Roadbed construction tamping and compacting device and tamping method
European Patent Office | 2024
|Roadbed tamping treatment equipment for highway construction
European Patent Office | 2024
|