Assembly type ditch cover plate and installation method
An assembly type ditch cover plate comprises a cover plate body, and a plurality of through holes are formed in the cover plate body. Bosses are arranged on the left side and the right side of the cover plate body respectively, and the bosses on the adjacent cover plate bodies are matched to form a flat plane. An assembly type ditch cover plate installation method comprises the following steps that S1, pre-embedded steel bars are arranged, specifically, anchoring steel bars are pre-embedded for a cast-in-place pool wall, and threading is conducted; s2, a prefabricated ditch cover plate is installed, after the cast-in-place pool wall meets the requirement, the prefabricated ditch cover plate is installed, and anchoring steel bars penetrate through through holes in the prefabricated ditch cover plate and are fixed through nuts; and S3, reserved hole site blocking is conducted, specifically, after the anchoring steel bars are fixed, grouting materials are adopted for reserved hole site blocking.
一种装配式沟渠盖板,包括盖板本体,盖板本体上设有多个通孔;所述盖板本体左右两侧分别设有凸台,相邻的盖板本体上的凸台配合形成一个平整的平面。一种装配式沟渠盖板安装方法,其包括如下步骤:S1,预埋钢筋的设置,对于现浇池壁,预埋锚固钢筋,并进行套丝;S2,预制沟渠盖板安装,带现浇池壁满足要求后,进行预制沟渠盖板的安装,锚固钢筋穿过预制沟渠盖板上的通孔并采用螺母固定;S3,预留孔位封堵,待锚固钢筋固定完成后,采用灌浆料进行预留孔位的封堵。
Assembly type ditch cover plate and installation method
An assembly type ditch cover plate comprises a cover plate body, and a plurality of through holes are formed in the cover plate body. Bosses are arranged on the left side and the right side of the cover plate body respectively, and the bosses on the adjacent cover plate bodies are matched to form a flat plane. An assembly type ditch cover plate installation method comprises the following steps that S1, pre-embedded steel bars are arranged, specifically, anchoring steel bars are pre-embedded for a cast-in-place pool wall, and threading is conducted; s2, a prefabricated ditch cover plate is installed, after the cast-in-place pool wall meets the requirement, the prefabricated ditch cover plate is installed, and anchoring steel bars penetrate through through holes in the prefabricated ditch cover plate and are fixed through nuts; and S3, reserved hole site blocking is conducted, specifically, after the anchoring steel bars are fixed, grouting materials are adopted for reserved hole site blocking.
一种装配式沟渠盖板,包括盖板本体,盖板本体上设有多个通孔;所述盖板本体左右两侧分别设有凸台,相邻的盖板本体上的凸台配合形成一个平整的平面。一种装配式沟渠盖板安装方法,其包括如下步骤:S1,预埋钢筋的设置,对于现浇池壁,预埋锚固钢筋,并进行套丝;S2,预制沟渠盖板安装,带现浇池壁满足要求后,进行预制沟渠盖板的安装,锚固钢筋穿过预制沟渠盖板上的通孔并采用螺母固定;S3,预留孔位封堵,待锚固钢筋固定完成后,采用灌浆料进行预留孔位的封堵。
Assembly type ditch cover plate and installation method
一种装配式沟渠盖板及安装方法
LYU JIAYAO (author) / XUE TIANQIONG (author) / CHANG YOUNG KYU (author) / ZHU XIAOYU (author)
2024-04-26
Patent
Electronic Resource
Chinese
Hydraulic telescopic installation device for side ditch cover plate
European Patent Office | 2022
|Side ditch cover plate for subsea tunnel and installation method
European Patent Office | 2024
|Prefabricated assembly type seismic isolation ditch cover plate device
European Patent Office | 2021
|