Special-shaped subway station combined foundation pit reinforcement excavation construction system and method
The invention provides a special-shaped subway station combined foundation pit reinforcing excavation construction system and method, and relates to the field of building construction.The special-shaped subway station combined foundation pit reinforcing excavation construction system comprises an anti-disengagement lock column, the anti-disengagement lock column is longitudinally connected to one side of the bottom of an installation hook in an inserted mode, and a hanging assembly can adaptively control the use state of the anti-disengagement lock column; after materials are not hoisted or hoisted materials stably fall to the ground, the anti-falling lock column can be automatically opened, operation of hooking and removing the materials by people is facilitated, meanwhile, the anti-falling lock column can be automatically closed when the materials are hoisted, the phenomenon that a hooking cable of the materials is separated from an installation hook body in the hoisting process of the materials is avoided, use is stable, and the practicability is high. The safety buckle of the lifting hook of the tower crane for excavation of the foundation pit simplifies the operation process during material lifting, and solves the problems that the safety buckle of the lifting hook of the existing tower crane for excavation of the foundation pit does not have an adaptive opening and closing function, that is, manual buckle opening and buckle closing operation is needed during material lifting and material removing each time, and the operation is troublesome.
本发明提供一种异型地铁车站组合基坑加固开挖施工系统及方法,涉及建筑施工领域,包括:防脱锁柱,所述防脱锁柱纵向的插接在安装钩体底部的一侧,吊挂组件能够适应性的控制防脱锁柱的使用状态,具体来说,就是在不吊运物料或者吊运的物料平稳落地后,防脱锁柱能够自动开启,方便人们挂接物料和摘除物料的操作,同时在吊运物料时防脱锁柱能够自动关闭,避免物料在吊运过程中其挂接缆绳脱出安装钩体的现象发生,使用稳定,简化了吊运物料时的操作流程,解决了现有基坑开挖用塔吊吊钩的安全扣不具备适应性启闭的功能,即每次在吊运物料以及摘除物料时,均需要人工进行开扣和关扣的操作,操作麻烦的问题。
Special-shaped subway station combined foundation pit reinforcement excavation construction system and method
The invention provides a special-shaped subway station combined foundation pit reinforcing excavation construction system and method, and relates to the field of building construction.The special-shaped subway station combined foundation pit reinforcing excavation construction system comprises an anti-disengagement lock column, the anti-disengagement lock column is longitudinally connected to one side of the bottom of an installation hook in an inserted mode, and a hanging assembly can adaptively control the use state of the anti-disengagement lock column; after materials are not hoisted or hoisted materials stably fall to the ground, the anti-falling lock column can be automatically opened, operation of hooking and removing the materials by people is facilitated, meanwhile, the anti-falling lock column can be automatically closed when the materials are hoisted, the phenomenon that a hooking cable of the materials is separated from an installation hook body in the hoisting process of the materials is avoided, use is stable, and the practicability is high. The safety buckle of the lifting hook of the tower crane for excavation of the foundation pit simplifies the operation process during material lifting, and solves the problems that the safety buckle of the lifting hook of the existing tower crane for excavation of the foundation pit does not have an adaptive opening and closing function, that is, manual buckle opening and buckle closing operation is needed during material lifting and material removing each time, and the operation is troublesome.
本发明提供一种异型地铁车站组合基坑加固开挖施工系统及方法,涉及建筑施工领域,包括:防脱锁柱,所述防脱锁柱纵向的插接在安装钩体底部的一侧,吊挂组件能够适应性的控制防脱锁柱的使用状态,具体来说,就是在不吊运物料或者吊运的物料平稳落地后,防脱锁柱能够自动开启,方便人们挂接物料和摘除物料的操作,同时在吊运物料时防脱锁柱能够自动关闭,避免物料在吊运过程中其挂接缆绳脱出安装钩体的现象发生,使用稳定,简化了吊运物料时的操作流程,解决了现有基坑开挖用塔吊吊钩的安全扣不具备适应性启闭的功能,即每次在吊运物料以及摘除物料时,均需要人工进行开扣和关扣的操作,操作麻烦的问题。
Special-shaped subway station combined foundation pit reinforcement excavation construction system and method
一种异型地铁车站组合基坑加固开挖施工系统及方法
YANG FAN (author) / ZHAN FUMIN (author) / ZHOU PING (author) / XIE XIANLONG (author) / XIE RENLIANG (author) / ZOU BAOPING (author) / ZHU XIAOJUN (author) / HE SHOUHAI (author) / LI DEMING (author) / SONG WENKUI (author)
2024-04-26
Patent
Electronic Resource
Chinese
Subway station deep foundation pit excavation construction method
European Patent Office | 2015
|Subway station construction method, foundation pit excavation method and foundation pit
European Patent Office | 2021
|Subway transfer station deep foundation pit excavation support construction method
European Patent Office | 2021
|Construction method of cover excavation and underground excavation combined subway station structure
European Patent Office | 2023
|Excavation construction method of subway station open-cut interval foundation pit
European Patent Office | 2021
|