Retarded-bonding prestress construction method for partial cable-stayed bridge
The invention discloses a partial cable-stayed bridge retard-bonded prestress construction method. The method comprises the steps that S1, steel strands are blanked; s2, mounting an anchorage device at the fixed end; s3, laying and fixing the steel strands; s4, concrete pouring is conducted; s5, preparation is conducted before the steel strand is tensioned; s6, the steel strand is tensioned; and S7, sealing the anchor. And rapid and economical construction can be realized.
本发明公开了一种部分斜拉桥缓粘结预应力施工方法,包括:步骤S1,钢绞线下料;步骤S2,固定端锚具安装;步骤S3,钢绞线铺设固定;步骤S4,混凝土浇筑;步骤S5,钢绞线张拉前准备;步骤S6,钢绞线张拉;步骤S7,封锚。能够实现快速经济地施工。
Retarded-bonding prestress construction method for partial cable-stayed bridge
The invention discloses a partial cable-stayed bridge retard-bonded prestress construction method. The method comprises the steps that S1, steel strands are blanked; s2, mounting an anchorage device at the fixed end; s3, laying and fixing the steel strands; s4, concrete pouring is conducted; s5, preparation is conducted before the steel strand is tensioned; s6, the steel strand is tensioned; and S7, sealing the anchor. And rapid and economical construction can be realized.
本发明公开了一种部分斜拉桥缓粘结预应力施工方法,包括:步骤S1,钢绞线下料;步骤S2,固定端锚具安装;步骤S3,钢绞线铺设固定;步骤S4,混凝土浇筑;步骤S5,钢绞线张拉前准备;步骤S6,钢绞线张拉;步骤S7,封锚。能够实现快速经济地施工。
Retarded-bonding prestress construction method for partial cable-stayed bridge
一种部分斜拉桥缓粘结预应力施工方法
YUAN WEIMING (author) / LIN SHENG (author) / SHU XUQIN (author) / ZHANG AIGANG (author) / XU XIANGHONG (author) / WANG BING (author) / WANG HAOTIAN (author)
2024-04-30
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Prestress in Cable-stayed Bridges
British Library Online Contents | 1997
|CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
European Patent Office | 2020
|