The invention provides a steel bar machining site construction method, and belongs to the technical field of site construction. The site is leveled, and a foundation pit of the site is poured, so that the flatness and firmness of the site are improved; meanwhile, the field is of a structure with the high middle and the low periphery, so that drainage of the field is facilitated. The crown block is mounted on the stand columns through the brackets and the bearing cross beams, so that hoisting equipment is arranged in a site, and subsequent hoisting of products is facilitated; the profiled color steel plate is fixed on the purline of the truss through the self-tapping screw, so that the color steel plate can be fixed on the purline of the truss without punching and tapping in advance, and meanwhile, the rainproof performance of the work shed is improved.
本发明提供了一种钢筋加工场地施工方法,属于场地施工技术领域;将场地平整,并对场地的基坑进行浇筑,以提升场地的平整性及牢固性;同时,使场地呈中间高四周低的结构,以便于对场地进行排水。通过将天车通过牛腿和承重横梁安装在立柱上,从而实现场地内具有吊装设备,以便于后续对产品的吊装;通过用自攻螺钉将压型彩钢板固定在桁架的檩条上,以实现无需在事前打孔及攻丝就可以将彩钢板固定在桁架的檩条上,同时提升工棚具有防雨性。
Construction method for reinforcing steel bar processing site
The invention provides a steel bar machining site construction method, and belongs to the technical field of site construction. The site is leveled, and a foundation pit of the site is poured, so that the flatness and firmness of the site are improved; meanwhile, the field is of a structure with the high middle and the low periphery, so that drainage of the field is facilitated. The crown block is mounted on the stand columns through the brackets and the bearing cross beams, so that hoisting equipment is arranged in a site, and subsequent hoisting of products is facilitated; the profiled color steel plate is fixed on the purline of the truss through the self-tapping screw, so that the color steel plate can be fixed on the purline of the truss without punching and tapping in advance, and meanwhile, the rainproof performance of the work shed is improved.
本发明提供了一种钢筋加工场地施工方法,属于场地施工技术领域;将场地平整,并对场地的基坑进行浇筑,以提升场地的平整性及牢固性;同时,使场地呈中间高四周低的结构,以便于对场地进行排水。通过将天车通过牛腿和承重横梁安装在立柱上,从而实现场地内具有吊装设备,以便于后续对产品的吊装;通过用自攻螺钉将压型彩钢板固定在桁架的檩条上,以实现无需在事前打孔及攻丝就可以将彩钢板固定在桁架的檩条上,同时提升工棚具有防雨性。
Construction method for reinforcing steel bar processing site
一种钢筋加工场地施工方法
MA YUEYUAN (author) / ZHU GENSHEN (author) / HE HONGHAI (author) / LIU WENBIN (author) / JU WANCHAO (author) / ZHANG WEI (author)
2024-04-30
Patent
Electronic Resource
Chinese
Reinforcing steel bar protection device for construction site
European Patent Office | 2022
|Reinforcing steel bar welding equipment for construction engineering construction site
European Patent Office | 2022
|Reinforcing equipment and reinforcing method for steel structure construction
European Patent Office | 2022
|Reinforcing steel bar binding tool for construction site and using method thereof
European Patent Office | 2020
|Reinforcing steel bar cushion block protection reinforcing steel bar system construction method
European Patent Office | 2020
|