A platform for research: civil engineering, architecture and urbanism
Steel bar sleeve pile head breaking and removing device
The invention discloses a steel bar sleeve pile head breaking device, and belongs to the technical field of concrete pile head breaking, the steel bar sleeve pile head breaking device comprises a first semi-ring and a second semi-ring, the second semi-ring is slidably installed in the first semi-ring, and sliding rails are installed on the side faces of the first semi-ring and the second semi-ring; a first bearing plate and a second bearing plate are slidably connected to the two sliding rails correspondingly, an annular cutting device is slidably mounted at the top of the first bearing plate, and a drilling device is slidably mounted at the top of the second bearing plate. Through cooperation of internal installation, dust generated in the ring cutting process is sucked in time through the dust suction channel, generated noise is isolated through the hollow laminated glass box, the influence on the environment is reduced, ring cutting operation and drilling operation are conducted at the same time through the ring cutting device and the drilling and cracking device which can synchronously slide on the sliding rail, and the working efficiency is improved. Working procedures are optimized, construction efficiency is improved, and labor investment is low.
本发明公开了一种钢筋套管桩头破除装置,属于混凝土桩头破除技术领域,一种钢筋套管桩头破除装置,包括第一半环和第二半环,所述第一半环的内部滑动安装有第二半环,所述第一半环和第二半环的侧面均安装有滑轨,两个所述滑轨上分别滑动连接有第一承载板和第二承载板,所述第一承载板的顶部滑动安装有环切装置,所述第二承载板的顶部滑动安装有钻裂装置。本发明通过通过内部安装之间配合,在环切过程中产生的粉尘通过吸尘通道及时吸入,产生的噪音通过中空夹胶玻璃盒隔绝,减少对环境的影响,通过在滑轨上可同步滑动的环切装置以及钻裂装置,使环切作业与钻孔作业同时进行,优化工序,提高施工效率,人工投入少。
Steel bar sleeve pile head breaking and removing device
The invention discloses a steel bar sleeve pile head breaking device, and belongs to the technical field of concrete pile head breaking, the steel bar sleeve pile head breaking device comprises a first semi-ring and a second semi-ring, the second semi-ring is slidably installed in the first semi-ring, and sliding rails are installed on the side faces of the first semi-ring and the second semi-ring; a first bearing plate and a second bearing plate are slidably connected to the two sliding rails correspondingly, an annular cutting device is slidably mounted at the top of the first bearing plate, and a drilling device is slidably mounted at the top of the second bearing plate. Through cooperation of internal installation, dust generated in the ring cutting process is sucked in time through the dust suction channel, generated noise is isolated through the hollow laminated glass box, the influence on the environment is reduced, ring cutting operation and drilling operation are conducted at the same time through the ring cutting device and the drilling and cracking device which can synchronously slide on the sliding rail, and the working efficiency is improved. Working procedures are optimized, construction efficiency is improved, and labor investment is low.
本发明公开了一种钢筋套管桩头破除装置,属于混凝土桩头破除技术领域,一种钢筋套管桩头破除装置,包括第一半环和第二半环,所述第一半环的内部滑动安装有第二半环,所述第一半环和第二半环的侧面均安装有滑轨,两个所述滑轨上分别滑动连接有第一承载板和第二承载板,所述第一承载板的顶部滑动安装有环切装置,所述第二承载板的顶部滑动安装有钻裂装置。本发明通过通过内部安装之间配合,在环切过程中产生的粉尘通过吸尘通道及时吸入,产生的噪音通过中空夹胶玻璃盒隔绝,减少对环境的影响,通过在滑轨上可同步滑动的环切装置以及钻裂装置,使环切作业与钻孔作业同时进行,优化工序,提高施工效率,人工投入少。
Steel bar sleeve pile head breaking and removing device
一种钢筋套管桩头破除装置
WEN XIAOCONG (author) / KE LILI (author) / XU CAIZHANG (author) / YUE LIZHANG (author)
2024-05-03
Patent
Electronic Resource
Chinese
Pile foundation pile head breaking device and breaking method
European Patent Office | 2024
|Bridge pile foundation pile head breaking device and breaking method
European Patent Office | 2020
|