Permanent and temporary combined basement structure and construction method thereof
The invention relates to a permanent and temporary combined basement structure and a construction method thereof, and belongs to the technical field of basements. A first connecting assembly for fixing the supporting structure and the roof plate is arranged between the supporting structure and the roof plate, and a second connecting assembly for fixing the supporting structure and the bottom plate is arranged between the supporting structure and the bottom plate; the first connecting assembly comprises a first connecting steel bar, the first connecting steel bar is arranged in the roof plate, and a first driving assembly for inserting the first connecting steel bar into the supporting structure is arranged in the roof plate; and the second connecting assembly comprises second connecting steel bars, the second connecting steel bars are arranged in the bottom plate, a second driving assembly for inserting the second connecting steel bars into the supporting structure is arranged in the bottom plate, and the effect of reducing potential safety hazards is achieved.
本申请涉及一种永临结合地下室结构及其施工方法,属于地下室的技术领域,其室体结构,包括楼顶板和底板;支护结构,支护结构与楼顶板之间设置有将二者相固定的第一连接组件,支护结构与底板之间设置有将二者相固定的第二连接组件;第一连接组件包括第一连接钢筋,第一连接钢筋设置在楼顶板内,楼顶板内设置有将第一连接钢筋插入支护结构的第一驱动组件;第二连接组件包括第二连接钢筋,第二连接钢筋设置在底板内,底板内设置有将第二连接钢筋插入支护结构的第二驱动组件,本申请具有降低安全隐患的效果。
Permanent and temporary combined basement structure and construction method thereof
The invention relates to a permanent and temporary combined basement structure and a construction method thereof, and belongs to the technical field of basements. A first connecting assembly for fixing the supporting structure and the roof plate is arranged between the supporting structure and the roof plate, and a second connecting assembly for fixing the supporting structure and the bottom plate is arranged between the supporting structure and the bottom plate; the first connecting assembly comprises a first connecting steel bar, the first connecting steel bar is arranged in the roof plate, and a first driving assembly for inserting the first connecting steel bar into the supporting structure is arranged in the roof plate; and the second connecting assembly comprises second connecting steel bars, the second connecting steel bars are arranged in the bottom plate, a second driving assembly for inserting the second connecting steel bars into the supporting structure is arranged in the bottom plate, and the effect of reducing potential safety hazards is achieved.
本申请涉及一种永临结合地下室结构及其施工方法,属于地下室的技术领域,其室体结构,包括楼顶板和底板;支护结构,支护结构与楼顶板之间设置有将二者相固定的第一连接组件,支护结构与底板之间设置有将二者相固定的第二连接组件;第一连接组件包括第一连接钢筋,第一连接钢筋设置在楼顶板内,楼顶板内设置有将第一连接钢筋插入支护结构的第一驱动组件;第二连接组件包括第二连接钢筋,第二连接钢筋设置在底板内,底板内设置有将第二连接钢筋插入支护结构的第二驱动组件,本申请具有降低安全隐患的效果。
Permanent and temporary combined basement structure and construction method thereof
一种永临结合地下室结构及其施工方法
DUAN SHUANGQING (author) / YU FENGLONG (author) / HU YULIAN (author) / WANG WEIJIE (author)
2024-05-07
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of permanent and temporary combined integral basement ramp
European Patent Office | 2023
|European Patent Office | 2023
|European Patent Office | 2023
|Expressway permanent and temporary combined construction structure and construction method thereof
European Patent Office | 2024
|Permanent and temporary combined dock wall structure and construction method thereof
European Patent Office | 2023
|