Expressway permanent and temporary combined construction structure and construction method thereof
The invention discloses a highway permanent-temporary combined construction structure and a construction method thereof.The highway permanent-temporary combined construction structure comprises a highway body and retaining walls arranged on the two sides of the highway body, steel supports are arranged on the two sides of the highway body, and the steel supports are used for temporarily separating construction areas of the highway body in the early stage of construction; the steel bracket is used as a steel structure for pouring the retaining wall in the later construction period; the steel support is further provided with an anchoring part, and the anchoring part is embedded in the ground and reinforces the steel support. The construction method of the expressway permanent and temporary combined construction structure comprises the following steps: S1, surveying; s2, enclosing a construction area; s3, constructing a road main body; s4, formwork erecting is conducted, specifically, a formwork is erected on the steel support, and the formwork is used for pouring the retaining wall; step S5, pouring a retaining wall: pouring concrete grout into the template and tamping the concrete grout; and S6, removing the mold, and checking the construction quality of the expressway. The method has the effect of reducing waste of building materials in the highway construction process.
本发明公开了一种高速公路永临结合施工结构及其施工方法,一种高速公路永临结合施工结构包括公路主体以及设置于公路主体两侧的挡墙,公路主体建造两侧设置有的钢支架,施工前期钢支架用于临时分隔公路主体的施工区域,施工后期钢支架用作浇筑挡墙的钢结构;钢支架还设置有锚固件,锚固件预埋于地面并加固钢支架。一种高速公路永临结合施工结构的施工方法包括以下步骤:步骤S1:勘测;步骤S2:围护施工区域;步骤S3:公路主体建造;步骤S4:支模:向钢支架搭建模板,模板用于浇筑挡墙;步骤S5:浇筑挡墙:向模板浇筑混凝土浆液并捣实混凝土浆液;步骤S6:拆模,核验高速公路施工质量。本申请具有减少高速公路施工过程中建筑材料的浪费的效果。
Expressway permanent and temporary combined construction structure and construction method thereof
The invention discloses a highway permanent-temporary combined construction structure and a construction method thereof.The highway permanent-temporary combined construction structure comprises a highway body and retaining walls arranged on the two sides of the highway body, steel supports are arranged on the two sides of the highway body, and the steel supports are used for temporarily separating construction areas of the highway body in the early stage of construction; the steel bracket is used as a steel structure for pouring the retaining wall in the later construction period; the steel support is further provided with an anchoring part, and the anchoring part is embedded in the ground and reinforces the steel support. The construction method of the expressway permanent and temporary combined construction structure comprises the following steps: S1, surveying; s2, enclosing a construction area; s3, constructing a road main body; s4, formwork erecting is conducted, specifically, a formwork is erected on the steel support, and the formwork is used for pouring the retaining wall; step S5, pouring a retaining wall: pouring concrete grout into the template and tamping the concrete grout; and S6, removing the mold, and checking the construction quality of the expressway. The method has the effect of reducing waste of building materials in the highway construction process.
本发明公开了一种高速公路永临结合施工结构及其施工方法,一种高速公路永临结合施工结构包括公路主体以及设置于公路主体两侧的挡墙,公路主体建造两侧设置有的钢支架,施工前期钢支架用于临时分隔公路主体的施工区域,施工后期钢支架用作浇筑挡墙的钢结构;钢支架还设置有锚固件,锚固件预埋于地面并加固钢支架。一种高速公路永临结合施工结构的施工方法包括以下步骤:步骤S1:勘测;步骤S2:围护施工区域;步骤S3:公路主体建造;步骤S4:支模:向钢支架搭建模板,模板用于浇筑挡墙;步骤S5:浇筑挡墙:向模板浇筑混凝土浆液并捣实混凝土浆液;步骤S6:拆模,核验高速公路施工质量。本申请具有减少高速公路施工过程中建筑材料的浪费的效果。
Expressway permanent and temporary combined construction structure and construction method thereof
一种高速公路永临结合施工结构及其施工方法
LI JUNBO (author) / LI XIAOBIN (author)
2024-10-18
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
/
E04G
SCAFFOLDING
,
Baugerüste
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Permanent and temporary combined basement structure and construction method thereof
European Patent Office | 2024
|Permanent and temporary combined dock wall structure and construction method thereof
European Patent Office | 2023
|Novel permanent and temporary combined retaining structure and construction method thereof
European Patent Office | 2021
|Permanent and temporary combined cofferdam structure and construction method
European Patent Office | 2024
|