A platform for research: civil engineering, architecture and urbanism
Cable-stayed bridge structure and construction supervision method thereof
The invention discloses a cable-stayed bridge structure. The cable-stayed bridge structure comprises a cable-stayed bridge body and a maintenance mechanism, the cable-stayed bridge comprises a cable-stayed bridge body, the cable-stayed bridge body comprises a main beam, a tower is fixedly connected to the top of the main beam, cables distributed at equal intervals are evenly and fixedly connected to the outer side of the tower, and one end of each cable is fixedly connected with the main beam; the maintenance mechanism comprises a box body fixedly connected to the tower, a motor and a storage battery are fixedly installed in the box body, and an output shaft of the motor is fixedly connected with a threaded rod; according to the cable-stayed bridge structure and the construction supervision method thereof, the maintenance mechanism is arranged on the cable-stayed bridge body, so that a solar panel can supply power to a motor through a storage battery, and therefore after the motor drives a threaded rod to rotate, a crawling ladder can move on a tower, and a worker can conveniently check all connecting points of the tower and a cable; through the arrangement, the maintenance work of the cable-stayed bridge is more convenient, and the working efficiency during construction supervision of the cable-stayed bridge is also improved.
本发明公开了一种斜拉桥结构,包括:斜拉桥本体和检修机构;所述斜拉桥本体包括主梁,所述主梁的顶部固定连接有塔架,所述塔架的外侧均匀固定连接有等距分布的缆索,所述缆索的一端与主梁固定连接;所述检修机构包括固定连接在塔架上的箱体,所述箱体的内部分别固定安装有电机和蓄电池,所述电机的输出轴固定连接有螺纹杆;本斜拉桥结构及其施工的监理方法通过在斜拉桥本体上设置检修机构,使太阳能板能够通过蓄电池对电机进行供电,从而使电机带动螺纹杆转动后,爬梯能够在塔架上移动,进而便于工作人员对塔架与缆索的各个连接点进行检查;通过以上设置,不仅使斜拉桥的维护工作更加方便,也提升了斜拉桥施工监理时的工作效率。
Cable-stayed bridge structure and construction supervision method thereof
The invention discloses a cable-stayed bridge structure. The cable-stayed bridge structure comprises a cable-stayed bridge body and a maintenance mechanism, the cable-stayed bridge comprises a cable-stayed bridge body, the cable-stayed bridge body comprises a main beam, a tower is fixedly connected to the top of the main beam, cables distributed at equal intervals are evenly and fixedly connected to the outer side of the tower, and one end of each cable is fixedly connected with the main beam; the maintenance mechanism comprises a box body fixedly connected to the tower, a motor and a storage battery are fixedly installed in the box body, and an output shaft of the motor is fixedly connected with a threaded rod; according to the cable-stayed bridge structure and the construction supervision method thereof, the maintenance mechanism is arranged on the cable-stayed bridge body, so that a solar panel can supply power to a motor through a storage battery, and therefore after the motor drives a threaded rod to rotate, a crawling ladder can move on a tower, and a worker can conveniently check all connecting points of the tower and a cable; through the arrangement, the maintenance work of the cable-stayed bridge is more convenient, and the working efficiency during construction supervision of the cable-stayed bridge is also improved.
本发明公开了一种斜拉桥结构,包括:斜拉桥本体和检修机构;所述斜拉桥本体包括主梁,所述主梁的顶部固定连接有塔架,所述塔架的外侧均匀固定连接有等距分布的缆索,所述缆索的一端与主梁固定连接;所述检修机构包括固定连接在塔架上的箱体,所述箱体的内部分别固定安装有电机和蓄电池,所述电机的输出轴固定连接有螺纹杆;本斜拉桥结构及其施工的监理方法通过在斜拉桥本体上设置检修机构,使太阳能板能够通过蓄电池对电机进行供电,从而使电机带动螺纹杆转动后,爬梯能够在塔架上移动,进而便于工作人员对塔架与缆索的各个连接点进行检查;通过以上设置,不仅使斜拉桥的维护工作更加方便,也提升了斜拉桥施工监理时的工作效率。
Cable-stayed bridge structure and construction supervision method thereof
一种斜拉桥结构及其施工的监理方法
DONG YUANJUN (author) / HUANG LEILEI (author) / FANG WEIWU (author) / HE ZHENYU (author) / HOU MENGQI (author)
2024-05-10
Patent
Electronic Resource
Chinese
CABLE-STAYED BRIDGE AND CABLE-STAYED BRIDGE CONSTRUCTION METHOD
European Patent Office | 2020
|Cable-stayed bridge structure and construction method thereof
European Patent Office | 2021
|