A platform for research: civil engineering, architecture and urbanism
Ballast bed settlement transformation construction method
The invention discloses a ballast bed settlement transformation construction method, which belongs to the technical field of rail transit, and comprises the following steps: detecting a ballast bed, and determining a settlement area of the ballast bed and settlement parameters of the settlement area; the steel rails in the settlement area are dismantled; according to the settlement parameters, a groove extending in the transverse direction is formed in one side of the original sleeper in the settlement area; replacing sleepers are placed in all the grooves, and all the replacing sleepers are installed in the grooves; arranging a plurality of steel bars around the replacement sleeper; and concrete is poured in the settlement area until the poured concrete completely submerges all the steel bars, and a new ballast bed is formed after solidification. The invention provides a ballast bed settlement transformation construction method which can adapt to large-area high-settlement ballast bed settlement characteristics, synchronous construction of large-area ballast bed settlement can be achieved, accurate adjustment of ballast bed high-settlement can be guaranteed, and therefore in the limited construction skylight period, the ballast bed settlement transformation construction method is suitable for large-area high-settlement ballast bed settlement. And high-efficiency and high-accuracy transformation of a ballast bed settlement area is ensured.
本发明公开了一种道床沉降改造施工方法,属于轨道交通技术领域,包括以下步骤:检测道床,确定道床的沉降区域以及沉降区域的沉降参数;拆除沉降区域内的钢轨;根据沉降参数,在沉降区域内的原轨枕一侧开设沿横向延伸凹槽;在各个凹槽内均放入替换轨枕,将各个替换轨枕安装在凹槽中;在替换轨枕周围布置若干钢筋;在沉降区域内浇筑混凝土,直至浇筑混凝土完全淹没各钢筋,固化后形成新的道床。本发明提供了一种道床沉降改造施工方法,其能够适应大区域高沉降的道床沉降特性,不仅能够实现大区域道床沉降的同步施工,还能够确保对道床高沉降的准确调整,进而使得在有限的施工天窗期内,保证对道床沉降区域的高效率高准确度的改造。
Ballast bed settlement transformation construction method
The invention discloses a ballast bed settlement transformation construction method, which belongs to the technical field of rail transit, and comprises the following steps: detecting a ballast bed, and determining a settlement area of the ballast bed and settlement parameters of the settlement area; the steel rails in the settlement area are dismantled; according to the settlement parameters, a groove extending in the transverse direction is formed in one side of the original sleeper in the settlement area; replacing sleepers are placed in all the grooves, and all the replacing sleepers are installed in the grooves; arranging a plurality of steel bars around the replacement sleeper; and concrete is poured in the settlement area until the poured concrete completely submerges all the steel bars, and a new ballast bed is formed after solidification. The invention provides a ballast bed settlement transformation construction method which can adapt to large-area high-settlement ballast bed settlement characteristics, synchronous construction of large-area ballast bed settlement can be achieved, accurate adjustment of ballast bed high-settlement can be guaranteed, and therefore in the limited construction skylight period, the ballast bed settlement transformation construction method is suitable for large-area high-settlement ballast bed settlement. And high-efficiency and high-accuracy transformation of a ballast bed settlement area is ensured.
本发明公开了一种道床沉降改造施工方法,属于轨道交通技术领域,包括以下步骤:检测道床,确定道床的沉降区域以及沉降区域的沉降参数;拆除沉降区域内的钢轨;根据沉降参数,在沉降区域内的原轨枕一侧开设沿横向延伸凹槽;在各个凹槽内均放入替换轨枕,将各个替换轨枕安装在凹槽中;在替换轨枕周围布置若干钢筋;在沉降区域内浇筑混凝土,直至浇筑混凝土完全淹没各钢筋,固化后形成新的道床。本发明提供了一种道床沉降改造施工方法,其能够适应大区域高沉降的道床沉降特性,不仅能够实现大区域道床沉降的同步施工,还能够确保对道床高沉降的准确调整,进而使得在有限的施工天窗期内,保证对道床沉降区域的高效率高准确度的改造。
Ballast bed settlement transformation construction method
一种道床沉降改造施工方法
LI QIUYI (author) / YANG ZHOU (author) / XIAO ZHIQUN (author) / REN XICHONG (author) / ZHANG SHIJIE (author) / ZHANG ZHENG (author) / ZHANG CHAOYONG (author) / ZHU BIN (author) / SUN LI (author) / WANG GUFENG (author)
2024-05-14
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Urban rail transit large settlement section ballast bed transformation method
European Patent Office | 2024
|ESTIMATION METHOD FOR BALLAST SETTLEMENT AMOUNT AT BALLAST TRACK
European Patent Office | 2019
|Construction method for controlling settlement of railway ballast bed based on geogrid
European Patent Office | 2022
|Construction method for rapidly repairing monolithic ballast bed settlement in skylight period
European Patent Office | 2020
|