A platform for research: civil engineering, architecture and urbanism
Wall connection construction method and wall
The invention discloses a wall connection construction method and a wall. The wall body connection construction method comprises the steps that an upper prefabricated wall body and a lower prefabricated wall body are provided, a plurality of sleeves extending up and down are arranged in the end portion of the lower end of the upper prefabricated wall body, the sleeves are arranged at intervals in the direction perpendicular to the up-down direction, and the upper end of the lower prefabricated wall body is connected with a plurality of first connecting ribs extending up and down; the first connecting ribs are arranged at intervals in the direction perpendicular to the vertical direction. The upper prefabricated wall body is arranged above the lower prefabricated wall body, and the multiple first connecting ribs are inserted into the multiple sleeves in a one-to-one correspondence mode; the lower end face of the upper prefabricated wall body and the upper end face of the lower prefabricated wall body are separated to form a communicating cavity, a vibrating piece is arranged in the communicating cavity, and the multiple sleeves communicate with the communicating cavity; grouting materials are poured into the communication cavity, and the vibration piece is controlled to vibrate. The full degree of the grouting material in the sleeve can be improved, and the effect that the grouting material wraps the first connecting rib and the second connecting rib in the sleeve and conducts force transmission connection is guaranteed.
本发明公开了一种墙体连接施工方法及墙体。其中,墙体连接施工方法包括提供上预制墙体和下预制墙体,上预制墙体的下端端部内设有多个上下延伸的套筒,多个套筒沿垂直于上下方向间隔开布置,下预制墙体的上端连接有多个上下延伸的第一连接筋,多个第一连接筋沿垂直于上下方向间隔开布置;将上预制墙体置于下预制墙体上方且多个第一连接筋一一对应地插设于多个套筒;使上预制墙体的下端面和下预制墙体的上端面之间间隔开形成连通腔并在连通腔中布置振动件,多个套筒均与连通腔连通;向连通腔灌注灌浆料并控制振动件振动。本发明可以提升套筒内灌浆料的饱满程度,有利于保证灌浆料对套筒内第一连接筋和第二连接筋的握裹及传力连接的效果。
Wall connection construction method and wall
The invention discloses a wall connection construction method and a wall. The wall body connection construction method comprises the steps that an upper prefabricated wall body and a lower prefabricated wall body are provided, a plurality of sleeves extending up and down are arranged in the end portion of the lower end of the upper prefabricated wall body, the sleeves are arranged at intervals in the direction perpendicular to the up-down direction, and the upper end of the lower prefabricated wall body is connected with a plurality of first connecting ribs extending up and down; the first connecting ribs are arranged at intervals in the direction perpendicular to the vertical direction. The upper prefabricated wall body is arranged above the lower prefabricated wall body, and the multiple first connecting ribs are inserted into the multiple sleeves in a one-to-one correspondence mode; the lower end face of the upper prefabricated wall body and the upper end face of the lower prefabricated wall body are separated to form a communicating cavity, a vibrating piece is arranged in the communicating cavity, and the multiple sleeves communicate with the communicating cavity; grouting materials are poured into the communication cavity, and the vibration piece is controlled to vibrate. The full degree of the grouting material in the sleeve can be improved, and the effect that the grouting material wraps the first connecting rib and the second connecting rib in the sleeve and conducts force transmission connection is guaranteed.
本发明公开了一种墙体连接施工方法及墙体。其中,墙体连接施工方法包括提供上预制墙体和下预制墙体,上预制墙体的下端端部内设有多个上下延伸的套筒,多个套筒沿垂直于上下方向间隔开布置,下预制墙体的上端连接有多个上下延伸的第一连接筋,多个第一连接筋沿垂直于上下方向间隔开布置;将上预制墙体置于下预制墙体上方且多个第一连接筋一一对应地插设于多个套筒;使上预制墙体的下端面和下预制墙体的上端面之间间隔开形成连通腔并在连通腔中布置振动件,多个套筒均与连通腔连通;向连通腔灌注灌浆料并控制振动件振动。本发明可以提升套筒内灌浆料的饱满程度,有利于保证灌浆料对套筒内第一连接筋和第二连接筋的握裹及传力连接的效果。
Wall connection construction method and wall
墙体连接施工方法及墙体
LI WENFENG (author) / XU JIANWEI (author) / WAN JINGUO (author) / SU YUKUN (author) / MA PEIPEI (author) / LIU XI (author) / YU FANGCHENG (author) / WANG CHONGYANG (author)
2024-05-14
Patent
Electronic Resource
Chinese
Fabricated parapet wall bolt connection construction method
European Patent Office | 2022
|Fabricated subway station side wall and diaphragm wall connection construction method
European Patent Office | 2023
|Fabricated wall structure connection construction equipment
European Patent Office | 2021
|European Patent Office | 2019
|