A platform for research: civil engineering, architecture and urbanism
Reinforcing method for shield tunneling machine to laterally penetrate through power transmission line iron tower
The invention relates to the technical field of shield tunnel construction, and discloses a reinforcing method for a shield tunneling machine to laterally penetrate through a power transmission line iron tower, which comprises the following steps: S1, preparing for construction, and breaking a road surface; s2, measuring the pile position according to the position of the power transmission line iron tower, and positioning and paying off; s3, concrete is poured on the two sides of the tops of the pile positions to form guide walls; s4, drilling secant pile construction is started, plain piles without reinforcement cages on the two sides are constructed firstly, and then reinforced piles with reinforcement cages in the middles are constructed; s5, in-pile waist bars at the tops of the drilling secant piles are used for pouring concrete to form a top beam, and all pile foundations are connected together; and S6, earthwork backfilling is conducted. According to the method, the tower footing of the power transmission line iron tower and the surrounding stratum can be reinforced.
本发明涉及盾构隧道施工技术领域,公开了一种盾构机侧穿输电线路铁塔的加固方法,包括以下步骤:S1施工准备、破除路面;S2根据输电线路铁塔的位置对桩位进行测量,定位放线;S3在桩位顶部两侧浇灌混凝土形成导墙;S4开始钻孔咬合桩施工,先施工两侧无钢筋笼的素桩,再施工中间有钢筋笼的荤桩;S5利用钻孔咬合桩顶部的桩内腰筋浇筑混凝土形成冠梁,将所有的桩基连在一起;S6进行土方回填。本发明能够对输电线路铁塔塔基以及周围的地层都进行了加固。
Reinforcing method for shield tunneling machine to laterally penetrate through power transmission line iron tower
The invention relates to the technical field of shield tunnel construction, and discloses a reinforcing method for a shield tunneling machine to laterally penetrate through a power transmission line iron tower, which comprises the following steps: S1, preparing for construction, and breaking a road surface; s2, measuring the pile position according to the position of the power transmission line iron tower, and positioning and paying off; s3, concrete is poured on the two sides of the tops of the pile positions to form guide walls; s4, drilling secant pile construction is started, plain piles without reinforcement cages on the two sides are constructed firstly, and then reinforced piles with reinforcement cages in the middles are constructed; s5, in-pile waist bars at the tops of the drilling secant piles are used for pouring concrete to form a top beam, and all pile foundations are connected together; and S6, earthwork backfilling is conducted. According to the method, the tower footing of the power transmission line iron tower and the surrounding stratum can be reinforced.
本发明涉及盾构隧道施工技术领域,公开了一种盾构机侧穿输电线路铁塔的加固方法,包括以下步骤:S1施工准备、破除路面;S2根据输电线路铁塔的位置对桩位进行测量,定位放线;S3在桩位顶部两侧浇灌混凝土形成导墙;S4开始钻孔咬合桩施工,先施工两侧无钢筋笼的素桩,再施工中间有钢筋笼的荤桩;S5利用钻孔咬合桩顶部的桩内腰筋浇筑混凝土形成冠梁,将所有的桩基连在一起;S6进行土方回填。本发明能够对输电线路铁塔塔基以及周围的地层都进行了加固。
Reinforcing method for shield tunneling machine to laterally penetrate through power transmission line iron tower
盾构机侧穿输电线路铁塔的加固方法
HU CHENGRUI (author) / CAO BO (author) / XU WEI (author) / XIAO ZHIJUN (author) / LUO YAN (author) / ZHOU JIN (author) / ZHANG CHENG (author)
2024-05-24
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|European Patent Office | 2021
|European Patent Office | 2020
|Reinforcing and adjusting device for power transmission line iron tower
European Patent Office | 2021
|Reinforcing and erecting structure for power transmission line iron tower
European Patent Office | 2023
|