Structure and construction method of underground waterproof engineering skip-bay-method construction joint
The invention discloses a construction joint structure and construction method for underground waterproof engineering by a skip bay method, and the construction method comprises the following steps: labor force preparation: preparing 260 on-site general commanders, commanders, concrete workers, erection workers, vibrators, plastering workers, reinforcement workers, carpenters, foundation pit drainage, electricians, machinery, measurers and testers; according to the construction method, the construction quality can be improved, a post-cast strip is replaced with a skip method comprehensive technology, two seams are changed into one seam, and the whole structure is seamlessly integrated after 7 days, so that the construction quality is improved, the construction period is shortened, the construction period is shortened, and the construction efficiency is improved. Therefore, the problems of accumulation and difficulty in cleaning of garbage left in the post-cast strip for a long time, corrosion of steel bars and leakage hidden danger of the post-cast strip area can be avoided.
本发明公开了地下防水工程跳仓法施工缝的构造及施工方法,劳动力准备,需要准备现场总指挥、指挥员、混凝土工、架子工、振捣工、抹灰工、钢筋工、木工、基坑排水、电工、机械、测量员、试验员,总计260人;混凝土供应商的选择,混凝土采用预拌混凝土,与混凝土供应商需签订混凝土技术合同,明确大体积混凝土的各项技术参数,本发明有利于提高施工质量,采用跳仓法综合技术取代后浇带,两缝变一缝,并且7d以后封仓,整个结构成为无缝一体,这样可避免后浇带长期留置的垃圾积聚与清理困难问题、钢筋锈蚀问题,以及后浇带区域的渗漏隐患。
Structure and construction method of underground waterproof engineering skip-bay-method construction joint
The invention discloses a construction joint structure and construction method for underground waterproof engineering by a skip bay method, and the construction method comprises the following steps: labor force preparation: preparing 260 on-site general commanders, commanders, concrete workers, erection workers, vibrators, plastering workers, reinforcement workers, carpenters, foundation pit drainage, electricians, machinery, measurers and testers; according to the construction method, the construction quality can be improved, a post-cast strip is replaced with a skip method comprehensive technology, two seams are changed into one seam, and the whole structure is seamlessly integrated after 7 days, so that the construction quality is improved, the construction period is shortened, the construction period is shortened, and the construction efficiency is improved. Therefore, the problems of accumulation and difficulty in cleaning of garbage left in the post-cast strip for a long time, corrosion of steel bars and leakage hidden danger of the post-cast strip area can be avoided.
本发明公开了地下防水工程跳仓法施工缝的构造及施工方法,劳动力准备,需要准备现场总指挥、指挥员、混凝土工、架子工、振捣工、抹灰工、钢筋工、木工、基坑排水、电工、机械、测量员、试验员,总计260人;混凝土供应商的选择,混凝土采用预拌混凝土,与混凝土供应商需签订混凝土技术合同,明确大体积混凝土的各项技术参数,本发明有利于提高施工质量,采用跳仓法综合技术取代后浇带,两缝变一缝,并且7d以后封仓,整个结构成为无缝一体,这样可避免后浇带长期留置的垃圾积聚与清理困难问题、钢筋锈蚀问题,以及后浇带区域的渗漏隐患。
Structure and construction method of underground waterproof engineering skip-bay-method construction joint
地下防水工程跳仓法施工缝的构造及施工方法
CHEN XIAOYUAN (author) / CHENG TAO (author) / JING HANLIN (author) / CUI JIAN (author) / WEI MING (author) / BAO GENPING (author)
2024-05-28
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underground engineering construction joint waterproof method
European Patent Office | 2024
|Underground diaphragm wall joint waterproof construction method and waterproof structure
European Patent Office | 2023
|Underground engineering node waterproof structure construction method
European Patent Office | 2020
|