A platform for research: civil engineering, architecture and urbanism
Construction method of super-long seam-free pool and rolling support of super-long seam-free pool
The invention relates to a construction method of a super-long seam-free pool, and belongs to the field of super-long pool construction, and the construction method comprises the following steps: S1, constructing a plurality of foundation bases, and arranging the plurality of foundation bases along the length direction of the pool; s2, a cushion layer is poured, and the elevation of the top face of the cushion layer is the same as that of the top face of the foundation base; s3, a rolling support is installed on the foundation base, a fixed part of the rolling support is fixed to the foundation base, and a movable part of the rolling support is arranged to move in the length direction of the pool; s4, a plastic plate is laid on the cushion layer, and the supporting part of the rolling support and the plastic plate serve as a bottom formwork of the pool; and S5, the pool is poured. On the premise that no deformation joint is arranged, the length of the pool can be further increased, and meanwhile cracks generated by the pool are reduced.
本申请涉及一种超长不设缝水池的施工方法,属于超长水池施工领域,其包括以下步骤:S1、施工若干基础底座,若干基础底座沿着水池的长度方向设置;S2、浇筑垫层,并且垫层顶面标高与基础底座顶面标高相同;S3、在基础底座上安装滚动支座,滚动支座的固定部固定在基础底座上,并使滚动支座的移动部设置为沿着水池的长度方向移动;S4、垫层上铺设塑料板材,将滚动支座的支撑部和塑料板材作为水池的底模板;S5、浇筑水池。本申请具有在不设置变形缝的前提下,可以进一步增加水池的长度,同时减少水池产生的裂缝的效果。
Construction method of super-long seam-free pool and rolling support of super-long seam-free pool
The invention relates to a construction method of a super-long seam-free pool, and belongs to the field of super-long pool construction, and the construction method comprises the following steps: S1, constructing a plurality of foundation bases, and arranging the plurality of foundation bases along the length direction of the pool; s2, a cushion layer is poured, and the elevation of the top face of the cushion layer is the same as that of the top face of the foundation base; s3, a rolling support is installed on the foundation base, a fixed part of the rolling support is fixed to the foundation base, and a movable part of the rolling support is arranged to move in the length direction of the pool; s4, a plastic plate is laid on the cushion layer, and the supporting part of the rolling support and the plastic plate serve as a bottom formwork of the pool; and S5, the pool is poured. On the premise that no deformation joint is arranged, the length of the pool can be further increased, and meanwhile cracks generated by the pool are reduced.
本申请涉及一种超长不设缝水池的施工方法,属于超长水池施工领域,其包括以下步骤:S1、施工若干基础底座,若干基础底座沿着水池的长度方向设置;S2、浇筑垫层,并且垫层顶面标高与基础底座顶面标高相同;S3、在基础底座上安装滚动支座,滚动支座的固定部固定在基础底座上,并使滚动支座的移动部设置为沿着水池的长度方向移动;S4、垫层上铺设塑料板材,将滚动支座的支撑部和塑料板材作为水池的底模板;S5、浇筑水池。本申请具有在不设置变形缝的前提下,可以进一步增加水池的长度,同时减少水池产生的裂缝的效果。
Construction method of super-long seam-free pool and rolling support of super-long seam-free pool
一种超长不设缝水池的施工方法及其滚动支座
PENG JUN (author) / ZHANG SHUJUN (author) / DENG ANYAN (author) / FANG WEI (author)
2024-06-04
Patent
Electronic Resource
Chinese
Super-long pool structure initiation seam construction structure and method
European Patent Office | 2022
|Integral biochemical pool initiation seam construction method
European Patent Office | 2021
|Overhead pool bottom plate initiation seam construction method
European Patent Office | 2023
|Waterproof structure for super-long pool wall construction joint
European Patent Office | 2023
|Construction crack control method for super-long large-size concrete pool
European Patent Office | 2021
|