A platform for research: civil engineering, architecture and urbanism
Pile plate type retaining wall high-altitude crown beam construction method
The invention discloses a pile plate type retaining wall high-altitude top beam construction method which comprises the steps that S1, construction preparation is conducted, specifically, all formworks and support components are prepared; s2, measuring and lofting, wherein measuring and lofting are conducted on the retaining wall according to a formwork support design drawing; and S3, a supporting system installation step: installing a support, installing I-shaped steel and an adjustable inclined strut, installing a main beam and a secondary beam of a bottom die, installing the bottom die, installing the support on a soil retaining plate of the pile plate type retaining wall, connecting the main beam with the support through the adjustable inclined strut, leveling by adopting a steel wedge block, and finally laying a small beam and a bottom template so as to realize top beam construction.
本发明公开了一种桩板式挡墙高空冠梁施工方法,所述桩板式挡墙高空冠梁施工方法包括:S1:施工准备步骤,完成各模板及支架构件准备;S2:测量放样步骤,根据模板支架设计图纸在挡土墙上进行测量放样;S3:支撑系统安装步骤,包括:支座安装、工字钢及可调斜撑安装、底模主次梁安装、底模安装,通过在桩板式挡墙的挡土板上安装支座,通过可调斜撑将主梁与支座进行连接,并采用钢楔块进行调平,最后铺设小梁及底模板,以实现冠梁施工。
Pile plate type retaining wall high-altitude crown beam construction method
The invention discloses a pile plate type retaining wall high-altitude top beam construction method which comprises the steps that S1, construction preparation is conducted, specifically, all formworks and support components are prepared; s2, measuring and lofting, wherein measuring and lofting are conducted on the retaining wall according to a formwork support design drawing; and S3, a supporting system installation step: installing a support, installing I-shaped steel and an adjustable inclined strut, installing a main beam and a secondary beam of a bottom die, installing the bottom die, installing the support on a soil retaining plate of the pile plate type retaining wall, connecting the main beam with the support through the adjustable inclined strut, leveling by adopting a steel wedge block, and finally laying a small beam and a bottom template so as to realize top beam construction.
本发明公开了一种桩板式挡墙高空冠梁施工方法,所述桩板式挡墙高空冠梁施工方法包括:S1:施工准备步骤,完成各模板及支架构件准备;S2:测量放样步骤,根据模板支架设计图纸在挡土墙上进行测量放样;S3:支撑系统安装步骤,包括:支座安装、工字钢及可调斜撑安装、底模主次梁安装、底模安装,通过在桩板式挡墙的挡土板上安装支座,通过可调斜撑将主梁与支座进行连接,并采用钢楔块进行调平,最后铺设小梁及底模板,以实现冠梁施工。
Pile plate type retaining wall high-altitude crown beam construction method
一种桩板式挡墙高空冠梁施工方法
YANG CHANGCAN (author) / ZHANG CAO (author) / PENG DAWEI (author) / HU QIANG (author) / WANG CHENGJUN (author) / LIU SHIGUO (author) / YE SHENGZHI (author)
2024-06-11
Patent
Electronic Resource
Chinese
Pile plate type retaining wall combined frame and construction method
European Patent Office | 2022
|Construction method of pile plate type retaining wall composite structure
European Patent Office | 2022
|Ecological pile plate type retaining wall and construction method thereof
European Patent Office | 2022