A platform for research: civil engineering, architecture and urbanism
Formwork support for ultrahigh cylindrical pier construction
A formwork support for ultrahigh cylindrical pier construction comprises a support body (1) and a connecting supporting frame (2), the support body (1) is of a square frame structure and installed on the ground, and a step ramp is installed in the square frame structure; the side face of the support body (1) is connected with the connecting supporting frame (2), and the other side of the connecting supporting frame (2) is fixedly connected with the ultrahigh cylindrical pier formwork (3). The support body (1) and the connecting supporting frame (2) are installed in a segmented mode along with the increase of the construction height of the ultrahigh cylindrical pier, and after the support body (1) is installed to a certain height, a stable connecting unit and a formwork installation construction platform are additionally arranged. The structure is simple, the strength is safe and stable, the concrete construction efficiency of the ultrahigh cylindrical pier is improved, the construction period is shortened, the construction cost is reduced, the safety risks of concrete pouring constructors of the ultrahigh cylindrical pier and a building structure are greatly reduced, and the concrete construction quality of the ultrahigh cylindrical pier is improved.
一种用于超高圆柱墩施工的模板支架,包括:支架主体(1)和连接支撑架(2),所述支架主体(1)为方形框架结构,其安装在地面上,所述方形框架结构内部安装有台阶坡道;支架主体(1)的侧面连接安装有连接支撑架(2),连接支撑架(2)的另一侧与超高圆柱墩模板(3)连接固定;所述支架主体(1)和连接支撑架(2)随超高圆柱墩的施工高度增加而分段安装,支架主体(1)安装到一定高度后加设稳定连接单元及模板安装施工平台。本发明结构简单、强度安全稳定,提高超高圆柱墩的混凝土施工效率、缩短施工工期、减少施工成本,大大降低超高圆柱墩的混凝土浇筑施工人员以及建筑结构的安全风险,提高超高圆柱墩的混凝土施工质量。
Formwork support for ultrahigh cylindrical pier construction
A formwork support for ultrahigh cylindrical pier construction comprises a support body (1) and a connecting supporting frame (2), the support body (1) is of a square frame structure and installed on the ground, and a step ramp is installed in the square frame structure; the side face of the support body (1) is connected with the connecting supporting frame (2), and the other side of the connecting supporting frame (2) is fixedly connected with the ultrahigh cylindrical pier formwork (3). The support body (1) and the connecting supporting frame (2) are installed in a segmented mode along with the increase of the construction height of the ultrahigh cylindrical pier, and after the support body (1) is installed to a certain height, a stable connecting unit and a formwork installation construction platform are additionally arranged. The structure is simple, the strength is safe and stable, the concrete construction efficiency of the ultrahigh cylindrical pier is improved, the construction period is shortened, the construction cost is reduced, the safety risks of concrete pouring constructors of the ultrahigh cylindrical pier and a building structure are greatly reduced, and the concrete construction quality of the ultrahigh cylindrical pier is improved.
一种用于超高圆柱墩施工的模板支架,包括:支架主体(1)和连接支撑架(2),所述支架主体(1)为方形框架结构,其安装在地面上,所述方形框架结构内部安装有台阶坡道;支架主体(1)的侧面连接安装有连接支撑架(2),连接支撑架(2)的另一侧与超高圆柱墩模板(3)连接固定;所述支架主体(1)和连接支撑架(2)随超高圆柱墩的施工高度增加而分段安装,支架主体(1)安装到一定高度后加设稳定连接单元及模板安装施工平台。本发明结构简单、强度安全稳定,提高超高圆柱墩的混凝土施工效率、缩短施工工期、减少施工成本,大大降低超高圆柱墩的混凝土浇筑施工人员以及建筑结构的安全风险,提高超高圆柱墩的混凝土施工质量。
Formwork support for ultrahigh cylindrical pier construction
一种用于超高圆柱墩施工的模板支架
DONG LIGANG (author) / YANG JINGRONG (author) / MU TIANSHU (author) / REN YONGQING (author) / XIN GUOJUN (author)
2024-06-14
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
European Patent Office | 2022
|European Patent Office | 2020
|Ultrahigh variable cross-section hollow pier creeping formwork and hollow pier construction method
European Patent Office | 2024
|Overall climbing system for ultrahigh pier steel formwork
European Patent Office | 2024
|Pier hoop support and bridge formwork support construction method
European Patent Office | 2020
|