A platform for research: civil engineering, architecture and urbanism
Booster station main transformer foundation embedded part adjusting device and construction method
The invention discloses a booster station main transformer foundation embedded part adjusting device and a construction method.The embedded part adjusting device comprises a buttress, a scaffold arranged on the periphery of the buttress, an embedded part arranged on the top of the buttress, and an opposite drawing wire arranged on the top of the embedded part; transverse scaffold pipes are arranged on the two sides of the upper middle portion of the opposite drawing wire respectively, and the ends of the transverse scaffold pipes extend out of the scaffold and are fixedly connected with the scaffold through cross-shaped fasteners. By developing the adjusting device, the embedded part can be rapidly and accurately installed, meanwhile, workers can conveniently adjust the embedded part, manpower, material resources and the use amount of machines are saved, quality and safety risks possibly existing in construction are greatly reduced, and the adjusting device is flexible to use, easy to operate and easy to popularize.
本发明公开了一种升压站主变压器基础预埋件调整装置及施工方法,其中:该预埋件调整装置包括支墩,在支墩的四周设置有脚手架,在支墩的顶部设置有预埋件,在预埋件的顶部设置有对拉丝,在对拉丝中上部的两侧分别设置有横向脚手架管,横向脚手架管的端部伸出脚手架的外部,并通过十字扣件与脚手架固定连接在一起。本发明通过研制调整装置,能够快速对预埋件进行精准安装,同时,便于工作人员对预埋件进行调整,节省人力、物力及机械使用量,大幅降低了施工中可能存在的质量、安全风险,使用灵活,操作简单,易于推广。
Booster station main transformer foundation embedded part adjusting device and construction method
The invention discloses a booster station main transformer foundation embedded part adjusting device and a construction method.The embedded part adjusting device comprises a buttress, a scaffold arranged on the periphery of the buttress, an embedded part arranged on the top of the buttress, and an opposite drawing wire arranged on the top of the embedded part; transverse scaffold pipes are arranged on the two sides of the upper middle portion of the opposite drawing wire respectively, and the ends of the transverse scaffold pipes extend out of the scaffold and are fixedly connected with the scaffold through cross-shaped fasteners. By developing the adjusting device, the embedded part can be rapidly and accurately installed, meanwhile, workers can conveniently adjust the embedded part, manpower, material resources and the use amount of machines are saved, quality and safety risks possibly existing in construction are greatly reduced, and the adjusting device is flexible to use, easy to operate and easy to popularize.
本发明公开了一种升压站主变压器基础预埋件调整装置及施工方法,其中:该预埋件调整装置包括支墩,在支墩的四周设置有脚手架,在支墩的顶部设置有预埋件,在预埋件的顶部设置有对拉丝,在对拉丝中上部的两侧分别设置有横向脚手架管,横向脚手架管的端部伸出脚手架的外部,并通过十字扣件与脚手架固定连接在一起。本发明通过研制调整装置,能够快速对预埋件进行精准安装,同时,便于工作人员对预埋件进行调整,节省人力、物力及机械使用量,大幅降低了施工中可能存在的质量、安全风险,使用灵活,操作简单,易于推广。
Booster station main transformer foundation embedded part adjusting device and construction method
一种升压站主变压器基础预埋件调整装置及施工方法
MA HUIHAO (author) / LI CI (author) / WEN LEI (author) / ZHOU PEIYAN (author) / CHEN QI (author) / WANG WEIWEI (author) / NIU JUNZHAO (author)
2024-06-14
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Method for installing main transformer of offshore booster station
European Patent Office | 2023
|Main transformer cavity foundation construction method and main transformer cavity foundation
European Patent Office | 2023
|Novel offshore booster station foundation grouting device
European Patent Office | 2020
|Enveloping type main transformer foundation construction method
European Patent Office | 2024
|Adjusting device for iron tower foundation embedded part
European Patent Office | 2023
|